Operating Department Smart Search


Sort :
Loading...
Go to Page :
Showing posts with label TRAFFIC. Show all posts
Showing posts with label TRAFFIC. Show all posts

Basic Function of control of Railway

Basic Functions of Control:

 

1. Train Control: This job is done by SCOR (Section Controller).Supervising & regulating movement of trains from station to station on the section to avoid delay to trains and to maximize utilisation of the capacity of the section by: -

(a) Monitoring movement of trains from station to station and recording paths and detention on COA.

(b) Arranging crossing and precedence of trains judiciously.

(c) Arranging working of departmental and material trains.

(d) Giving time signal to all stations on the section daily at appointed time

(e) Fulfilling interchange commitment.

(f) Arranging proper movement of assisting/ banking / light engines.

(g) Clearance of sick wagons from Roadside stations.

(h) Arrangement of relief for 10 hrs duty staff.

(i) Incident management on rail network & at station

(j) Arranging Engineering and/or power blocks in such a way as to involve minimum disturbance to train running.

(k) Maintaining fluidity of yards by controlling the flow of stock in and out of yard

(l) Arranging Speedy relief in case of accidents.

 

2. Traffic Control is the general and over-riding control for supervision of the movement of goods and coaching traffic on the section. It is exercised by :

 

(a) Collecting information from the various stations on the section in respect of –

(i) Registration for wagons outstanding at stations and arrangements for supply of wagons.

(ii) Number of wagons loaded and empty wagons/rakes awaiting despatch.

(b) Arranging running, regulation, putting back and cancellation of trains.(both freight & coaching)

(c) Securing maximum loads for trains.

(d) Collecting stock position from the different stations, marshalling and terminal yards.

(e) Arrangement of Crew & Guard for freight trains

(f) To keep liaison with adjoining Railways and Divisions for interchange commitments

(g) Monitoring and coordinating working of yards, goods sheds sidings, loco-shed, TXR depots etc.

(h) Supervising of stock control.

(i) Arranging supply of wagons against pending registration.

(j) Securing optimum utilisation of stock, with minimum detention.

(k) To ensure optimum utilisation of loco and staff.

(l) To arrange ART & Crane from adjoining Railway/ Division in case of accidents and other coordination.

 

3. Power Control -

Power Control is responsible for provision of motive power to all trains by maintaining position of locomotives.

(a) Requisitioning engines from loco sheds for all operating requirements, i.e. Train working, Shunting and Banking.

(b) Ensuring most economical use of engines by close supervision both in Traffic Yards and sheds.

(c) Ensuring the return of engines to “Home Sheds” at regular intervals for servicing and maintenance.

(d) Ensuring an even balance of engines and crews between running sheds for meeting demands of traffic,

(e) Ensuring that light engine kilometres is kept to the minimum.

(f) Providing guidance to running staff for troubleshooting.

 4. Carriage and Wagon -

Carriage and Wagon Control is responsible to assist the train and traffic control and to:

 

(a) Ensure timely examination and fitness of all trains

(b) To keep a watch over the detachment of sick wagons/coaches and to arrange for their early repair and fitness.

(c) Keeping a watch over availability of vital C&W components, like Air Hoses, Washers, Clamps etc.. and efficient working of equipments & machines in C&W depot to avoid detention to trains.

(d) To keep a watch over placement of wagons /coaches in sick line and their release.

(e) To keep account of detention to trains on C&W account and take remedial action.

(f) To provide guidance to running staff for trouble shooting.

(g) For Electrical Multiple Units, this function is performed by Traction Loco Controller (TLC).

(h) Monitor the movement of POH due stock to workshops

5. Commercial Control

 Commercial Control assists the Traffic and Train Control:

 

(a) To expeditiously dispose off unclaimed and unconnected wagons, parcel consignments.

(b) To keep a watch on detention to trains on Commercial account like Alarm Chain Pulling, Carriage watering, Parcel working etc., and take remedial measures.

(c) To ensure quick transhipment of sick wagons by arranging matching stock and labour.

(d) To keep a watch over submission of station returns.

(e) Monitoring of public complaints lodged at the stations.

(f) To ensure proper maintenance of public amenities available at stations.

(g) Any other job entrusted by Sr. DCM/ DCM.

 

6. Traction Power Contro

Traction Power Control is provided to assist in Traffic and Train Control for:

(a) Arranging maintenance blocks for OHE

(b) Arranging alternative power supply in case of tripping etc., through remote control.

(c) Monitoring OHE failures and taking remedial action.

(d) Monitoring detention of trains on OHE accounts.

(e) Guiding running/ station staff in trouble shooting.

 

7. Engineering Control: Monitors imposition & cancellation of Engineering Restrictions, Working of track machines & monitoring integrated maintainable blocks. To co-ordinate works during maintenance blocks Running of Material trains.

 

8. Signal Control assists Traffic and Train Control and is required :

 

 a) To keep a watch over the S&T failures and take remedial action.

b) To ensure efficient working of communication channels

 

9. Security Control is responsible for prevention of theft of property and assists passengers in trains/stations.

10. Crew Control:

a) Crew control ensures availability of Train crew (Loco Pilot).
b) He has got the details of all kinds of loco pilot available in the division like Goods & passenger.
c) Issue instruction to all depot/Lobbies regarding movement of crew so that crew may be available for the traffic in all directions as per forecast.
d) Maintain the balance of crew with all adjoining divisions.
e) Arrange relief for loco pilot and avoid bursting of 10 Hour rule.

12. ETL Control:

Issues instructions to ETL staff if complained regarding fan, light, Battery and dynamo in train.

 Functions of Traffic Control: The main functions of Traffic Control are:

a) Continuous supervision of the movement of all traffic in the controlled area with a view to achieve the maximum possible operating efficiency.

b) Systematic input of data to COA for maintenance of accurate charts of train movements and arrangements of crossing and precedence to the greatest advantage.

c) Analysis of detentions to trains

d) Planning, ordering and running of goods trains to the best possible paths.

e) Maintaining the fluidity of marshalling yards/freight terminals.

f) Taking remedial action in the event of yard/terminal congestion.

g) Elimination of avoidable detentions to goods stock at loading and unloading points and at transhipment stations.

h) Allotment and distribution of goods stock to stations,

i) Supply of information to adjoining controls, terminals and engine changing stations regarding the movements of trains to enable adequate timely arrangements for their reception and onward despatch.

j) Arranging of engineering and other departments blocks with minimum detention to traffic.

k) Running of material trains and other track machines, tower wagons etc.

l) Arranging relief for engine crews and Guards.

m) Ensuring maximum utilisation of locomotives.

n) Issuing instructions for train working in case of equipment failures and whenever abnormal methods or working have to be resorted to.

o) Speedy arrangements for relief rescue and restoration in the event of accident.

p) To assist in the realistic planning of time tables and punctual running of passenger trains in coordination with various departments, other divisions and other railways.

q) To keep a watch over damaged stock at road side stations, yards and sick lines and to ensure that they are promptly attended to

r) To rectify immediately the irregularities on the part of line staff and provide them necessary guidance.

s) To provide operations management information.

t) To ensure smooth functioning of COA and other IT applications

Brake Binding / Flat Tyre, Precaution, Detection & Duties Of Different Departments (Eng / Hindi)

BRAKE BINDING/FLAT TYRE

A) Setting of Empty/Load Device in Wagons-

The Empty/Load device in wagons if not set in correct position will cause brake binding and flat tyre.
1. To avoid cases of flat tyre /poor brake power, it should be ensured at the time of loading/unloading that Empty/Load Box lever should be put in correct position by Operating/Commercial staff i.e. On Empty Position - When wagon is empty or slightly loaded. On Loaded Position- When wagon is loaded.

2. This should be super checked by Guard at the time of starting train from originating point, and by TXR at the time of train examination.

FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS)

FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS)

INTRODUCTION

In keeping with global trend, there has been a long outstanding demand of the industry and trade for transparency in sharing of information to give the customers an up-to date business like environment. Railways in this millennium have decided not only to perform the traditional tasks of carrying passengers and goods efficiently, but also to change the mindset of working as a closed system. The great concern to improve on its market share has prompted Railways to have a multi pronged approach to its freight policy. Continuous Cargo Visibility has always been a critical component of the Supply Chain Distribution Management System.

TSL working on Double line

TEMPORARY SINGLE LINE WORKING ON DOUBLE LINE (TSL) SR 6.02-1


1. Where an accident to a train or track or other obstructions takes place on a double line, one of line cannot be used, then the traffic may temporarily worked on single line, which is called TSL working. The traffic may work under any one of the following system. a. By obtaining line clear on electrical speaking instrument. b. By the installation of single line block instruments and SLB demarcate the block section in the wrong direction if the affected line is likely to remain out of use for a substantial period. 

2. On receipt of reliable information in writing that one line is clear the SM in consultation with SCOR and the SM of the station at the other end of the section shall take steps to introduce TSL working.
3. In case of doubt, track safe certificate shall be obtained by the engineering official not less than the rank of an inspector/SSE. 

4. TSL working shall be introduced between the nearest station provided with cross over between UP and DN lines. 
5. IBS and ‘C’ class stations shall be kept closed and the commutator of the concerned block instruments shall be locked in ‘TOL’ position. Caution indicator shall be hung on the handle of block instrument in case of Daido instruments. 

6. SM proposing TSL working shall issue a message to the SM at the other end of affected section containing the following information under exchange of private numbers.

 a. Cause of introduction of TSL working. 

b. The line on which the TSL working is proposed.

c. Source of information that the said line is clear. d. Place of obstruction with kilometer number.

e. Names of intermediate station, if any, which would be out of use. 

f. Assurance that the trap points, if any, have been spiked or clamped and padlocked. 

g. Assurance that if the train is running on the right line the Last Stop Signal shall be kept in ON position. In case the train is running on the wrong line all fixed signals shall be kept in the ON position and 

h. The number and timing of the last train which arrived or left the block station issuing the message.

7. After exchanging of the above information line clear shall be obtained through the means of communication. 

8. Authority :-

a. Right line – T/D 602 

b. Wrong line – T/D 602 and T/511 if required or pilot out memo. The train shall be pilot out up to the last point.

9. Three parts of T/D 602 are as under:-

a. Line clear ticket 

b. Authority to pass signals at ON position 

c. Caution order in which the following are mentioned.

I. Line on which the train is going 

II. Place of obstruction

III. Speed of the first train shall be 25 KMPH subject to observance of other speed restrictions in force

V. Warning to observe neutral section for the train going on wrong line in electrified section and clamping/spiking of trap points if any 

V. In case of last stop signal hand signal shall also be exhibited after giving the authority.

Note: T/A 1425 and T/B 1425 Authority must be filled by both sides SM during TSL.

10. Loco pilot of the first train shall inform all gateman and gang men on the way about the introduction of TSL working specifying line on which the trains will run.

11. The loco pilot of the train proceeding on the wrong line shall switch-on the flasher light and sound frequently short whistles. If the flasher light is not found ON, the station staff/gatemen/gang men shall stop the train.

12. Second and subsequent trains may run at their booked speed subject to observance of  other speed restrictions in force.

13. When the train is stopped in the block section on accounts accident, failure, and obstruction or for any other exceptional cause and the loco pilot finds that he cannot proceed, it shall be protected as per GR 6.03.

RECEPTION OF TRAIN AT NEXT STATION

14. Trains proceeding on the wrong line shall stop opposite to the First Stop Signal of the right line or at the Last Stop Signal of the wrong line whichever comes first. The SM after ensuring that the points are set, clamped and pad locked shall depute a railway servant with a written authority to stop the train with danger hand signal and there after pilot the train into the station.

15. Trains proceeding on the right line shall be received by taking ‘OFF’ the approach stop signal.

16. If the loco pilot finds that no railway servant in uniform has been deputed to pilot the train then GR-4.44 shall be followed.

17. After the ensuring that the whole of the train has arrived completely with tail lamp/tail board the SM shall clear the section by giving private the number on telephone.

RESUMPTION OF NORMAL WORKING

a. On receipt of a written certificate from a responsible engineering official that obstructed line/ track is free and safe for the passage of trains, SM shall issue a message to the other station/stations under exchange of private number and in consultation with the SCOR normal working shall be resumed.

b. Block instruments and all fixed signals including those of IBH which were treated as closed shall be brought into use immediately.

c. An entry shall also be made in the TSR of all stations concerned showing the time of  suspension of double line working and resumption of normal working.

d. Loco pilot of the first train entering the section after resumption of normal working shall inform all gateman and gang men on the way about the resumption of normal working.

18. All the records in connection with the TSL working shall be retained at the station and the TI of the section must scrutinize and submit his report to the DRM within 7 days of the resumption of normal working.

Systems of Working

SYSTEM OF WORKING GR. 7.01 

The following SYSTEMS OF WORKING is applicable on Indian Railway.

1. Absolute Block System
2. Automatic Block System
3. Following Train System
4. Pilot & Guard System
5. Train Staff & Ticket System
6. One Train Only System

SR 7.01-1 Following three systems of working are applicable to the Central Railway.

1. Absolute Block System
2. Automatic Block System
3. One Train Only System

Index - Transportation (Operating)Guide - ADVANCE



A. G & Sr (General & Subsidiary Rule)B. Accident Manual


C . Operating Manual 

 

Index - Transportation (Operating) Guide- Advance

 

01.01 History Of Rail Transport In India

01.02.Functions Of The Traffic Department
01.021duty Of Operating Staff

01.03. Hierarchical Set Up And Line Of Control Of Operating Department

01.031 Responsibility Of Station Master (Supervisory) / Station Manager


01.032 Duty Of Deputy Station Manager (Outdoor)(Outdoor)

01.033 Duty Of Station Master / Manager - Block Station Master / Manager

01.034 Duty Of Panel Sm

01.035 Duty Of Points Man/Shunt Man

01.036 Duty Of Gate Man

01.037 Normal Period Of Preserved - Station Operating Registers And Records

01.04. Control Organisation

01.05. Basic Function Of Control

01.06. Duties Of Control Staff

01.07. Books / Documents And Basic Records To Be Kept In Control Office

01.09. Co- Ordination Between Control And Stations

01.10. Registers Generally Maintained In Control

01.11. Items Checked By Sr. Dom Daily / At Regular Intervals Periodically & Monthly

02.01. Caution Order / Speed Restrictions

02.02. Emergency Rescue Operation / Disaster Management

02.03. Preferential Traffic Order

02.04. Importance Of Freight Operation:

02.05. Transport Products

02.06. Freight Incentive Schemes

02.07. Rationalization Order

02.08. Development Of Rail-Side Warehouses

02.09.. Wagon Pool

02.10. Wagon Census On Broad Gauge

03.01. Loco Links And Power Plan Crew Links

03.02. 10-Hour Rule For Train Crew

03.03. Loco Maintenance Schedule

03.04. Brake Binding/Flat Tyre

03.05. G D R ( Guard Driver Report )

03.06. Nominated Intensive Examination Points On Central Railway

03.07. Working Of Clamped Wagon

03.08. Odc

03.10.1 Details Of Brake Power Certificate

04.01. Section Capacity And Throughput

04.02. Freight Operations Information System (Fois)

04.03. Operating Statistics

04.08. Roll On - Roll Off

05.01. Systems Of Working

05.02. Private Number

05.03. All Communication Failure On Double Line

05.04. All Communication Failure On Single Line

05.05. Tsl Working On Double Line

05.06. Abnormal Working In Automatic Section

06.01. Loco Link

06.02. Rake Link

06.04. Marshalling Of Train

07.01. Time Tables – Introduction

07.02. Punctuality

07.03. Coaching Vehicle Census

07.04. Rules For Booking Special Coaches & Special Trains On Ftr

07.05. Coaching Codes

07.06. Accident And Safety Organisation

 


ACCIDENT AND SAFETY ORGANISATION

ACCIDENT

Definition : For the purpose of Railway working, accident is an occurrence in the course of working of Railway which does or may affect the safety of the railway, its engine, rolling stock, permanent way and works, fixed installations, passengers or servant which affect the safety of others or which does or may cause delay to train or loss to the railway property. For statistical purposes accident has been classified in categories from A to R excluding I and O.

Classification of Accidents: (AM 117 –124)

Accidents are classified under following heads -

Coaching codes

Coaching codes

Vehicle codes for Coaching stock:- The following code letters must be used to designate the
various designations of coaching stock in use:

Rules for booking Special Coaches & Special Trains on FTR

Rules for booking Special Coaches & Special Trains on FTR

1. Reservation of special coaches / trains: Application for reservation of carriage must be made through the SM of originating station to the CPTM, giving details of the journey such as destination, route to be followed, halts enroute, and the specific train to which the coach is to be attached at least 30 days in advance and not more than 6 months prior to the commencement of journey.
2. In case any party wishes to requisition a special coach at a short notice of less than 30 days specific permission must be obtained from CPTM.
3. It will be the sole discretion of the Railway Administration to allot a coach / train and programme its movement depending on the availability of coaches, path and other operational considerations.

COACHING VEHICLE CENSUS

COACHING VEHICLE CENSUS

Coaching Vehicle census is conducted as and when, the directives are received from Railway Board. Prior to conducting a coaching vehicle census, CPTM holds a meeting and instructs the census officials. The month, date time of census is notified to all the staff involving in census. Unlike, goods wagon census, coaching vehicles census is not laborious, as the vehicles are generally run in rakes and they are keenly monitored daily. A Cardex system in the coaching cabinet was a method to monitor the movement of individual coaches. After full implementation of COIS, the monitoring of the movement of coaches will be further made easy.

6.4 Punctuality of Passenger carrying trains

Punctuality

As far as the passenger train operation is concerned the sole and core factor that gauges its efficiency is ‘punctuality’. It is monitored at various levels of Railway Operation and management. It is an all-important index which decides the overall working of passenger operation. It is undeniable and understandable facts that image of Railways solely depend on this factor. Any deviation or dilution of punctuality will lead to doom and gloom on the part of everyone. Considering the essence of punctual running it is the endeavor of every railway man to strain every nerve to achieve this and no stone shall be left unturned.

Concept of punctuality:

Punctuality on its own cannot be defined like any scientific item. It differs with perception of persons. What is punctuality in the eyes of a passenger may not be the same from what railways perceive. Both are striking a different note.

TIME TABLES – INTRODUCTION

TIME TABLES – INTRODUCTION

Time table is a schedule in a table form, showing details of arrivals and departures at every station of all trains carrying passengers. These time tables are issued by every zonal railway, generally every six months. However, with effect from 1st July 1991, new time table is issued once a year in July only. On Indian Railways there is another time table, "Trains at a Glance", which is issued by the Railway Board and carries stoppages of important trains at important stations only all over the Indian Railways, as against the Zonal Time Table which indicates stoppages of all scheduled trains at every station on the railways. The objectives of passenger time table are as under:

1. information for intending passengers regarding

i. schedules of arrivals and departures;
ii. through sectional and suburban trains;
iii. connections at various stations;

RAKE LINK - Operating Guide

Rake Link

The overall high-level plan for rake movements is described in a rake link booklet issued for official use only by a Zonal railway, which has details of the planned rake links, composition, marshalling order, permissible loads and accommodation in Mail / Express & Passenger trains handled by the Zone.

The schedule of the train is drawn by the respective Zonal Railway so as to run to the maximum before taken for the regular maintenance. This is published through a booklet by COM and CPTM. The rake link is drawn up keeping in mind asset utilization and maintenance schedules for the stock. The day-to-day operational schedules are then drawn up with this as the basis and used by the operational staff / marshalling yard staff. The rake link is also used by the reservation staff to determine the sizes and distribution of reserved accommodation quotas.

MARSHALLING OF TRAIN

MARSHALLING OF TRAIN 

Marshalling is attaching of vehicles on a train in a predetermined manner to ensure train safety, provide operational expediency and to maximize customers’ convenience.

Marshalling of Mail/ Express/Passenger trains:

The general principles kept in view while marshalling are:

i) Position of upper class coaches, ladies compartment, dining car, in respect of easy accessibility normally the dining cars or the catering compartments, air conditioned and upper class coaches, shall be marshaled in the middle of the train or as near to it as possible and ladies compartment will be near Guard’s SLR.

Private Number

Private Number


A Private Number is a number, obtained over the telephone or telegraph from the station master of the station granting Line Clear or requesting points to be set or signals to be pulled off. This number is noted on the paper forms such as the Line Clear Ticket or Conditional Line Clear Certificate and can be verified later at the receiving station (the one granting Line Clear) or requesting the signal or points change. This is an additional safety device.

Abnormal Working in Automatic Section

Abnormal Working in Automatic Section

A. Working of trains during prolonged failure of signals when means of communications are available (S.R.9.12 – 1)

1. In the event of prolonged failure of all signals the ‘Officials concerned of the Signalling Department shall take immediate steps to inform all concerned.
2. Before any train is allowed to enter the affected section, it shall be brought to a stand and the Loco Pilot, Guard, Controller and the Station Master concerned ahead of the affected section shall be informed.
3. The Station Master shall obtain ‘Line Clear’ for the train by one of the following means of communications, viz.
a. Station to station fixed telephones wherever available;
b. Fixed telephone such as Railway auto phones & BSNL / MTNL phones;

All Communication Failure on Double line

All Communication Failure on Double line (SR 6.02 –3)

1. In the event of total interruption of communication (TIC) occurring between two stations on a double line section, i.e. when Line Clear cannot be obtained by any one of the following means stated in order of preference viz :

  a. Block instruments; Track circuits or Axle counters;
  b. Telephones attached to the Block Instruments;
  c. Station to station fixed telephones wherever available;
  d. Fixed telephone such as Railway auto phones & BSNL / MTNL phones;
  e. Control Telephone;
 f. VHF sets under special instructions, but not as the sole means of communication on sections where               passenger trains run.

The following procedure shall be adopted for train passing.

LOCO LINK

LOCO LINK

Loco link is an arrangement of locomotive for working a set of trains from one station to other station for Mail/Express/Passenger trains. Loco link gives the requirement of locomotive required to run the given number of trains. Loco link is prepared by HQ office in consultation with COM.

Factors to be considered while preparing a loco link:

1) Availability of the Loco.
2) Trip Inspection:

Mail/Express or Passenger locomotives are required to be given trip inspection as under as per AC traction manual:-
After running of 3000 kms or at completion of a trip whichever is later.

OPERATING STATISTICS

 OPERATING STATISTICS

Railway Statistics: Essential for planning prioritizing and exceeding activities connected with operation.

The railway statistics are based on four factors -

Quantity
Distance
Duration and
Service

In Railway environment these relate to –

Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

.


Labels

TRAFFIC (40) Duties and Responsibility (24) Control Organisation (20) Abnormal Working (19) Accident (17) Working (संचालन) (17) LDCE Special Topic (16) Shunting (12) Systems & Equipment (12) Departmental Exam Special (11) TNC Guide (9) Duty of Operating Staff (7) INDEX (6) Signals (6) Operating Statistics (5) Specification (5) Automatic Section (4) Disaster Management (4) Operating (4) Advance Transportation (3) CAUTION ORDER / SPEED RESTRICTIONS (3) CMS (3) FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS) (3) Lobby system (3) Question Bank (3) Question with Answer (3) Railway (3) Train Manager (Guard) (3) 01.035 Duty of Points Man/Shunt Man (2) Accident Drill (2) Automatic Signal (2) Break Binding (2) COA (2) Crank Handle (2) Crew Management System (2) DUTIES OF STATION MASTER IN THE CASE OF ACCIDENTS (2) Data Logger (2) Defective Signals (2) Definition Of Operating Terms (2) Freight Train Operation (2) Loco Pilot Duty (2) P Way (2) Safety Device (2) Shunting Restrictions (2) TNC (2) Throughput (2) fois (2) 001. प्रस्तावना (1) 0010. स्टेशन संचालन नियम की अभिस्वीकृति रजिस्टर (क्र. 1 ) (1) 0011. कर्मचारी वैयक्तिक विवरण रजिस्टर (क्र. 2 ) (1) 0012. कर्मचारी परामर्श रजिस्टर (क्र. 3 ) (1) 0013. निरिक्षण रजिस्टर (क्र. 5 ) (1) 0014. एस एंड टी खराबी रजिस्टर (क्र. 7 ) (1) 0015. सतर्कता आदेश रजिस्टर (क्र. 8) (1) 0016. एस एंड टी खराबी मेमो बुक (क्र. 9 ) (1) 0017. दुर्घटना रजिस्टर (क्र. 11 ) (1) 0018. सतर्कता आदेश मैसेज बुक (क्र. 13) (1) 0019. संरक्षा तथा रजिस्टर (क्र. 14) (1) 002. स्टेशन मास्टर / उप स्टेशन मास्टर की ड्यूटी लिस्ट (1) 0020. डिस्कनेक्शन तथा रिकनेक्शन रजिस्टर (क्र. 15) (1) 0021. आपातकालीन क्रास ऑवर टेस्टिंग रजिस्टर (क्र. 16 ) (1) 0022. रिले रूम चाबी रजिस्टर (क्र. 19 ) (1) 0023. संयुक्त पाइंट एंड क्रासिंग रजिस्टर (क्र. 20) (1) 0024. संयुक्त ट्रैक सर्किट रजिस्टर (क्र. 20 A) (1) 0025. असामान्य संचालन रजिस्टर (क्र. 21 ) (1) 0026. स्टेबल लोड रजिस्टर (क्र. 22 ) (1) 0027. सिक बैगन रजिस्टर (क्र. 26) (1) 0028. क्रेक हैंडल टेस्टिंग रजिस्टर (1) 0029. इंजीनियरिंग एवं पॉवर ब्लाक रजिस्टर (1) 003. व्यक्तिगत परिचय (1) 0030. विभिन्न प्रकार के काउंटर नम्बर रजिस्टर (1) 0031. पैनल ब्लाक होने पर - स्टेशन मास्टर के कर्तव्य (1) 0033. गाड़ी संचालन से संबंधित महत्वपूर्ण अधिकार पत्र (1) 0034. स्टेशन परिचालन रजिस्टर के संरक्षण की सामान्य अवधि (1) 0035. घंटी कोड (1) 0037. दोहरी लाइन पर इकहरी लाइन का संचालन (1) 0038. कार्यभार सौपते समय तथा कार्यभार लेते समय ली जाने वाली सावधानियां (1) 0039. संरक्षा उपस्कर (1) 004. पूनश्र्चर्या पाठ्यक्रम (1) 0041. शंटिंग के दौरान ली जाने वाली सावधानियां (1) 0042. विभिन्न प्रकार के ब्लाक में लि जाने वाली सावधानियां (1) 0046. सिग्नल पार करने (SPAD) पर स्टेशन मास्टर के कर्तव्य (1) 005. आवधिक चिकित्सा परीक्षा (PME) (1) 0051. बोगी कबर्ड बैगनो की जानकारी (1) 0052. कोचिंग स्टॉक का तकनीकी डाटा (1) 0054. LHB कोच की महत्वपूर्ण जानकारियाँ (1) 0056. स्टेशन पर अनिरक्षित किये जाने वाले अन्य रजिस्टर (लेखा विभाग से संबंधित ) (1) 0058. भरे हुए अधिकार पत्र (1) 006. संरक्षा परामर्श फार्म (1) 008. प्रायवेट नंबर शीट (1) 009. स्टेशन संचालन नियम (1) 01.01 History of Rail Transport in India (1) 01.02.Functions of the Traffic Department (1) 01.03. Hierarchical set up and line of control of Operating Department (1) 01.032 Duty of Deputy Station Manager (Outdoor)(Outdoor) (1) 01.036 Duty of Gate Man (1) 01.037 Normal Period Of Preserved - Station Operating Registers and Records (1) 01.05. Basic Function of control (1) 01.06. Duties of Control Staff (1) 01.07. Books / documents and basic records to be kept in control office (1) 01.10. Registers generally maintained in control (1) 01.11. Items checked by Sr. DOM daily/ regular intervals periodically & monthly (1) 02.01 ट्रेन कंट्रोल एव गाड़िया संचालन में कंट्रोल के जिम्मदारी (1) 02.02 ट्रैफिक कंट्रोल (1) 02.02. Emergency Rescue Operation / Disaster Management (1) 02.03. PREFERENTIAL TRAFFIC ORDER (1) 02.03.पॉवर कंट्रोल (1) 02.04 वैगनो & इंजन की उपयोगिता (ENGINE UTILIZATION) (1) 02.04. Importance of Freight Operation: (1) 02.05. TRANSPORT PRODUCTS (1) 02.06. FREIGHT INCENTIVE SCHEMES (1) 02.07. Rationalization Order (1) 02.08. Development of rail-side warehouses (1) 02.09.. Wagon Pool (1) 03 - मास्टर चार्ट (MASTER CHART) (1) 03.01. LOCO LINKS AND POWER PLAN CREW LINKS (1) 03.02. 10-Hour Rule for Train Crew (1) 03.03. LOCO MAINTENANCE SCHEDULE (1) 03.05. G D R ( GUARD DRIVER REPORT ) (1) 03.06. NOMINATED INTENSIVE EXAMINATION POINTS ON CENTRAL RAILWAY (1) 03.07. WORKING OF CLAMPED WAGON (1) 03.08. ODC (1) 03.10.1 DETAILS OF BRAKE POWER CERTIFICATE (1) 04 - सुबह की पोजीशन (MORNING POSITION) (1) 04.01. Section Capacity and Throughput (1) 04.08. ROLL ON - ROLL OFF (1) 05 - बगाडी संचालन पर प्रभाव डालने वाले कारक (FATO) (1) 05.01. Systems of Working (1) 05.03. All Communication Failure on Double line (1) 05.04. All Communication Failure on Single line (1) 05.05. TSL working on Double line (1) 05.06. Abnormal Working in Automatic Section (1) 06 - 01.उपनगरीय नियंत्रण (SUBURBAN CONTROL) (1) 06 - 02.एरिया कंट्रोल (1) 06 - 04.सेंट्रल कंट्रोल (1) 06 - 05.Emergency control (1) 06- 03.ट्रेन मैनेजमेंट सिस्टम (TRAIN MANAGEMENT SYSTEM) (1) 06.01. LOCO LINK (1) 06.02. RAKE LINK (1) 06.04. MARSHALLING OF TRAIN (1) 07 - नियंत्रण कार्यालय में विभाग नियंत्रकों के कर्त्तव्य (DUTIES) (1) 07.01. TIME TABLES – INTRODUCTION (1) 07.02. Punctuality (1) 07.03. COACHING VEHICLE CENSUS (1) 07.04. Rules for booking Special Coaches & Special Trains on FTR (1) 07.05. Coaching codes (1) 07.06. ACCIDENT AND SAFETY ORGANISATION (1) 08 - विभिन्न परिस्थियों में खण्ड नियंत्रक (SCOR) द्वारा किये जाने वाले कार्य (1) 09 - सवारी गाडी के कोड (IRCA Rule Book - IV) (1) 10 - संखियकी (STATISTICS) (1) 12 - 01.विशेष प्रकार के माल स्टॉक की मार्शलिंग (1) 12 - 02.माल गाडी का ब्लाक रेक / Standard rake size for Train load (1) 12 - 03.ओ डि सि (ODC) संचालन (1) 12 - यात्री और माल गाडी का ब्लाक रेक (1) 13 - 01.डीविज़न वैगन बैलेंस / (DIVISONAL WAGON BALANCE) (1) 14 - SECTION CAPACITY) (1) 15 - 01.मालगाड़ी को आदेशित करना (ट्रेन ओर्ड़ेरिंग / TRAIN ORDERING ) (1) 15 - 02.माल गाडी की औसात गति (1) 15 - 03.वैगनो का यानात्रण (Transhipment of Goods) (1) 15 - 07.गाड़ीयो का प्रस्थान पूर्व विलंब (PDD) (1) 15 - मालगाड़ी संचालन (Goods Train Operation) एवं लोड टेबल (1) 15 -06.कन्टेनराईजेशन Container (CONCOR) (1) 16 - 02.समय सारणी (TIME TABLE) (1) 16 - 03.रेक लिंक / (RAKE LINK) (1) 16 - 04.प्लेटफार्म ऑक्यूपेशन चार्ट / (Platform Occupation Chart) (1) 16 - 05.पिट लाइन ऑक्यूपेशन चार्ट (Pit Line Occupation Chart) (1) 16 - 06.विषेश/वी आई पी गाड़ीयो का संचालन (Movement of Special/VIP Trains) (1) 16 - 07.मेला एवं मिलिटरी स्पेशल गाड़ियों का संचालन एवं सावधानियाँ (1) 16 - यात्री गाडी संचालन / Passenger Train Operation (1) 17 - स्टॉक रिपोर्ट / Stock Report (1) 18 - 01.क्रू लिंक (CREW LINK) / लोको लिंक (LOCO LINK) (1) 18 - 02.दस घंटे नियम (10 HOURS RULE) (1) 18 - लॉबी कार्य पध्दति / LOBBY WORKING (1) 19 - 01.इंजन योजना (POWER PLAN) (1) 19 - 02.इंजन की उपयोगीता (ENGINE UTILISATION) (1) 19 - 03.विशिष्ठ उर्जा खपत / SPECIFIC FUEL CONSUMPTION (SPC) (1) 19 - विभिन प्रकार के इंजन और उनक हार्स पॉवर तथा गती (1) 2.1 Various Machines for Track Maintenance (1) 20 - 01. रेशनलाइजेशन स्कीम : / Rationalization Scheme (1) 20 - 02.रोक (BAN) & प्रतिबंध (RESTRICTION) (1) 20 - 03.वैगन पंजीकरण (1) 20 - 04.वैगन उपयोगीता चक्र (WTR) (1) 20 - 05.वेगन सेन्सस / WAGON CENSUS (1) 20 - वैगन उपयोगीता / अधिमान्य यातायात आदेश :(PTO/PTS) (1) 21 - 01.विधुतिकृत सेक्शन में गाड़िया का संचालन (1) 21 - 02.ट्रैफिक वोर्किंग रूल्स (TWR) (1) 21 - 03.टावर वैगन का संचालन (1) 21 - समपार (लेवल क्रासिंग ) (1) 22 - 01.सिगनल को खतरे की स्तिथि में पर करना (SPAD) (1) 22 - 03.दुर्घटना होने पर खंण्ड नियंत्रक के कर्त्तव्य (AM - ३१९) (1) 22 - 04.दुर्घटना स्थल के प्रभारी अधिकारी के कर्तव्य (AM - 324) (1) 22 - 05.मंडल नियंत्रण कार्यालय के प्रभारी अधिकारी के कर्तव्य - (AM - 323) (1) 22 - 06.दुर्घटना होने पर स्टेशन मास्टर की ड्यूटी (ऍम 311) (1) 22 - 07.रहत व्यवस्थाओ की ओर्ड़ेरिंग देना (AM - 405) (1) 22 - 11.नॉन - इंटरलॉकिंग संचालन (Non - Interlocked Working) (1) 22.10 सुरक्षा डेविसस (Safety Devices) - ACD EOIT GSMR TAWD VCD WILD (1) 23 - कंट्रोल ओफ्फिक निर्देश (1) 24 - COA Main Menu (1) 25 - अग्रीम प्लाटिंग (चार्टिंग) / Advance Plotting (1) 26 - 01.नियंत्रण कार्यालय अनुप्रयोग हेतु त्वरित दिशा निर्दश (1) 26 - COA एवं FOIS के एकीकरण (Integration) हेतु अवय्शक निर्दाश (1) 27 - पश्चिम मध्य रेल तथा मध्य रेल के सहायक नियमो में विभिन्नता की सूची (1) 28 - निरीक्षण उसके उदेश्य और प्रकार (Inspection Its Objects & Type) (1) 28.01 Schedule Of Inspection By Operating / Safety Officers And Transportation Inspectors (1) 3.031 DIESEL LOCO SCHEDULE & DURATION (1) 3.09 ELECTRIC LOCOMOTIVE FEATURES (1) A.01 भारतीय रेल का इतिहास एवं प्रगति (1) A.02. भारतीय रेल का संगठनात्मक ढांचा (1) A.03.परिचालन विभाग का सेटअप (1) A.04. महत्वपूर्ण विभागों के सामान्य कार्य (1) A.05 सामान्य एवं सहायक नियम ब्लाक संचालन नियमावली दुर्घटना नियमावली (1) A.06.परिचालन नियमावली/ संचालन समय सारिणी (1) A.07.स्टेशन संचालन नियम (1) A.08.रेल सेवको पर साधारण लागू होने वाले नियम (1) A.09.महत्वपूर्ण परिभाषाए (1) A.10.सिगनलों का सामान्य परिचय (1) A.11.पटाखा सिगनल (1) A.12.हाथ सिगनल (1) A.13.गाड़ी संचालन पध्दतियाँ (1) A.15.वाहनों को सुरक्षित करना (1) A.17.हॉट एक्सल/फ़्लैट टायर/ओपेन डोर एवं हैंकिंग पार्ट (1) A.19.स्टेशनों/यार्ड में रखे जाने वाले रजिस्टर (1) A.20.गाड़ी परिचालन में ट्रेन्स क्लर्क की भूमिका (1) A.21.गाड़ी संचालन से समबंधित महत्वपूर्ण नियम (1) A.22.कंट्रोल संगठन के कार्य (1) A.23.स्टेशन/यार्ड/कंट्रोल आफिस के क्रिया कलाप (1) A.24.विभिन्न प्रकार के कोचिंग एवं गुड्स स्टॉक (1) A.25.ब्रेक पावर प्रमाण पत्र (1) A.26.इंजन एवं ब्रेकयान में एयर प्रेशर की मात्रा (1) A.27.कंटीन्युटी टेस्ट (1) A.28.बड़े आयाम के प्रेषण (1) A.29.सेंसस एवं स्टॉक रिपोर्ट (1) A.30.मालगाड़ी संचालन/ गाडियों को आर्डर करना (1) A.31.डिविजन वैगन संतुलन (1) A.32.इन्टरचेंज (1) A.35.वैगन पूल (1) A.36.वैगन उपयोगिता चक्र (1) A.37.परिचालन सांख्यिकी / परिचालन अनुपात (1) A.38.मोर्निंग पोजीशन फैटो (1) A.39.कोचिंग एवं गुड्स गाडियों की मार्शलिंग/घाट मार्शलिंग/रेक मार्शलिंग (1) A.41.जीडीआर चेक/ सेफ टू रन सर्टिफिकेट/ ओवर लोडिंग /अनइव्ह्न लोडिंग (1) A.42.लोड टेबल /एक्सल लोड / बैकिंग इंजन की आवश्यकता (1) A.43.माल गाडियों के विभिन्न प्रकार के ब्रेक पावर प्रमाणपत्र उनकी वैधता (1) A.44.स्थान शुल्क एवं विलंब शुल्क स्केटिंग (1) A.46.लोको आउटेज एवं इंजन उपयोगिता (1) ACD (1) ACF (1) ART - Accident Relief Train (1) AUTHORITIES USING IN TRAIN WORKING (1) AWS (1) Accident Inquiry (1) B.02.एफओआईएस/आर एस एम /टीएमएस /सीओआईएस/आईसीएमएस/पीएएम (1) B.05.यूटीएस/ पीआरएस UTS/PRS (1) B.06.ट्रेन मेनेजमेंट सिस्टम (1) B.07.एसीडी / टीसीएएस (1) BOOKED SPEED (1) Block working (1) CONCOR (1) Control of Shunting (1) Correction Slip (1) DFCCIL (1) Department (1) Duties of TNC (1) Duty (1) Duty List (1) Duty of Panel SM (1) Duty of Block Station Master / Manager (1) Duty of Station Master / Manager (1) Flat Tyre (1) Fly Shunting (1) G.01 Code for LHB Coaching Stock (1) G.01 रेल सेवकों पर साधारणतया लागू होने वाले नियम (1) G.02 G & SR - परिभाषाएं (1) G.02 स्टेशन पर अग्निसमन उपकरण (1) G.03 इन्टरलाॅकिंग एवं नाॅन-इन्टरलाॅकिंग. (1) G.04 पाॅइन्ट एवं सिगनल (1) G.05 विभिन्न प्रकार की लाइटें एवं रिपीटर (1) G.06 संचालन मे आनेवाले विभिन्न प्रकार के बोर्डं (1) G.07 इंजीनियरिंग सिगनल एवं कार्यस्थल का बचाव (1) G.08 सिगनल तथा पाॅइन्ट की खराबी (1) G.10 कार्य संचालन पद्धति (1) G.11केवल एक गाड़ी पद्धति (1) G.12 सम्पूर्ण ब्लाॅक पद्धति (1) G.13 गाड़ियों का संचालन (1) G.14 स्टेशनों पर बजाई जाने वाली घंटीया (1) G.15 आटोमेटिक ब्लाॅक पद्धति (1) G.16 अनुगामी गाड़ी पद्धति (1) G.17 सतर्कता आदेश (1) G.18 अवरुद्ध लाइन (1) G.19 शन्टिंग (1) G.21 मार्शलिंग एवं डेड इंजन का संचालन (1) G.21 गाड़ी को स्टेशन से रवाना करना (1) G.23 समयपालन (1) G.24 लोको पायलट व गार्ड के निजी उपकरण (1) G.25 गार्ड व लोको पायलट से संबंधित रजिस्टर व प्रपत्र (1) G.26 रनिंग लाइन पर लोड को स्टेबल व क्लीयर करना (1) G.29 विभिन परिस्थितियों में लोको पायलट की ड्यूटी (1) G.30 मेटेरियल ट्रेन का संचालन (1) G.31 विभिन्न परिस्थितियों मे स्टेशन मास्टर की ड्यूटी (1) G.32 गाड़ियों की गति (1) G.33 कैच एवं स्लिप साइडिंग (1) G.33 स्टेशनों पर विभिन्न उपकरण (1) G.34 लाॅक एवं ब्लाॅक उपकरण (1) G.35 असामान्य परिस्थितियों में गाड़ियों का संचालन (1) G.36 इंजन सीटी कोड (1) G.37 ई एम यू / एम ई एम यू / डी एम यू में संके तहेतु बेल कोड (1) G.37 नए परिचालन फाॅर्म (1) G.38 इंजीनियरिंग कार्य प्रणाली व इंजीनियरिंग वाहनों का संचाल (1) G.38 पावर ब्लाॅक (1) G.40 गाड़ी लिपिक के रजिस्टर व कार्यप्रणाली (1) Golden Hour (1) Group "B" (1) Guide (1) HKT (1) Hand Shunting (1) Hot Axle (1) Hotter Code (1) Hump Shunting (1) ICMS (1) IRCON (1) IRCTC (1) Imprest Cash (1) KNOW ABOUT - जन शिकायत पुस्तिका (1) KRCL (1) LED Torch (1) Loose Shunting (1) MPS (1) MRV-Medical Relief Van (1) Major causes of accidents (1) Medical Care (1) Mock Drill (1) Monsoon Patrolling (1) NDMA (1) NTES (1) Operating Ratio (1) PSUs (1) Pad Lock (1) Private Number (1) Push and Pull Shunting (1) Python Rake (1) Question Bank & Papers With Answer For Group "B" / Guard / Station Master etc Exam (1) RITES (1) RVNL (1) RailTel (1) Responsibility of Station Master (supervisory) (1) Rule. Manual (1) S 01.0 Significance Of Rule Books (1) S 01.01 Differences Between General And Subsidiary Rules (1) S 02.00 Rules And Instructions (1) S 03.00 Rules Applying To The Railway Servant Generally (1) S 05.00 Classification Of Station (1) S 07.00 DETONATING SIGNAL (1) S 08.00 Hand Signal (1) S 09.00 Traffic Board And Engineering Indicators (1) S 11.00 CONDITIONS FOR TAKING OFF SIGNALS (1) S 12.00 CONDITIONS FOR CLEARING THE SECTION AND PRECAUTIONS (1) S 13.00 AUTHORITIES USING IN TRAIN WORKING (1) S 14.00 INTERLOCKING AND ISOLATION (1) S 15.00 POINTS (1) S 16.00 WORKING OF TRAINS DURING OVERHAULING (1) S 17.00 DEFECTIVE POINTS (1) S 20.00 Reception Dispatch And Crossing Of Train At Station (1) S 22.00 PUSHING BACK OF TRAIN (1) S 23.00 SECURING VEHICLES AT STATION (1) S 24.00 VEHICLES ESCAPING FROM STATION (1) S 25.00 WORKING OF MATERIAL TRAIN (1) S 25.01 Procedure of sending material train into the Block Section (1) S 25.02 STABLING OF MATERIAL TRAIN (1) S 26.00 HOT AXLE AND FLAT TYRE (1) S 27.00 WORKING OF TRAIN WITHOUT BRAKE VAN (1) S 28.00 STANDARD TIME (1) S 29.00 SPEED CHART (1) S 30.00 ELECTRIC BLOCK INSTRUMENT (1) S 31.00 TAIL LAMP AND TAIL BOARD (1) S 36.00 TRAIN PARTING (1) S 37.00 TRAIN DIVIDING (1) S 38.00 SEND ASSISTING ENGINE INTO OBSTRUCTED BLOCK SECTION (1) S 42.00 YARD (1) S 43.00 DUTIES OF STATION STAFF TOWARDS CONTROL (1) S 44.00 WAGON EXCHANGE REGISTER (1) S 45.00 STOCK REPORT (1) S 46.00 WORKING OF TRAIN IN GHAT SECTION / CATCH AND SLIP SIDING (1) S 47.00 MEANS OF COMMUNICATION AND WHISTLE CODE (1) S 48.00 ACTION TAKEN DURING THE ACP (1) S 49.00 WORKING OF TRAIN DURING STORM / ANEMOMETER CYCLONE (1) S 50.00 FIRE IN TRAIN (1) S 51.00 INFORMATION SYSTEM / COA/ FOIS/ ICMS/ PRS etc (1) S 53.00 LOCOMOTIVE LIGHT (1) S 54.00 WORKING OF TRAIN IN ELECTRIFIED SECTION AND TOWER WAGON (1) S 55.00 LEVEL CROSSING GATE (1) S 56.00 OVER DIMENSIONAL CONSIGNMENT (O.D.C. ) (1) S 57.00 MARSHALLING (1) S 61.00 DEFECTIVE PARMANENT WAY (1) S 62.00 WORKING OF LONG HAUL TRAINS (PYTHON) ON CENTRAL RAILWAY (1) S 63.00 HEAVY HAUL TRAINS (1) S 64.00 ABBREVIATION (1) S 65.00 DIFFERENCE BETWEEN SUBSIDIARY RULES OF CR AND WCR (1) SERIOUS ACCIDENT (ऍम 105) (1) SH (1) SPEED ON TURNOUTS (1) Safety Chain (1) Scotch Block (1) Section Capacity (1) Shunting Order (1) Signal Exchange (1) Skid (1) Station Earning (1) Station Imprest (1) Station Inspection (1) Station Manager (1) TYPES OF TRACK MACHINE (1) Train Delayed in Block Section (1) VTO (1) Vehicle Guidance (1) Video (1) WAGON CENSUS ON BROAD GAUGE (1) WORKING OF TRACK MACHINE (TTM etc.) (1) WORKING OF TROLLY/LORRY (1) Yard Congestion (1) long Haul (1) काॅमन स्टार्टर पर गाड़ी का संचालन (1) परिचालन सूचना प्रणाली (1) पाइथाॅन रैक का संचालन (1) बिना सिगनल वाली लाइन (1) योजना बनाने में स्टेशन मास्टर की भूमिका (1) सिगनल खराब होने पर गाड़ियों का संचालन (1) स्टेशन मास्टर अवश्य ध्यान दे (1)