- INDEX
- Rail News
- Rly Facility
- Rly Circulars /Orders
- Rules - Rail Employee
- Retirement Benefit
- Departmental Exam
- Rly Question Papers & Bank
- Result
- Rly Study Material
- Know About Railway
- Rules & Rule Book
- Rly Mannuals & Codes
- Establishment Rules
- Financial Rules
- LDCE Traffic Guide - HINDI
- LDCE Traffic Guide
- C & W - Guide
- Loco Pilot Guide
- P Way- Guide
- Commercial Guide Hindi
- Commercial Guide
- Rail Management Guide
- Useful Calculator
- Forms- Rly Employee
- YouTube Video - Rly
- Rly Telephone Directory
- Railway Plus
- Rly Store Guide
- राजभाषा -हिंदी
- Also Read
- Horoscope
Operating Department Smart Search
कंट्रोल चार्ट &विभिन्न यार्ड , स्टेशन तथा शैड को नियंत्रक द्वारा निर्देशित करना
Special Train Controllers Allowance
Special Train Controllers Allowance
As per RBE No. 86/2017 & RBE 129/ 2017
The Section Controllers and Chief Controllers are entitled for the special Train Controllers Allowances at ₹ 5000/- pm.
This allowance is admissible w.e.f: 01.07.2017.
The
allowance will increase by 25 percent each time DA rises by 50 percent.
आरबीई संख्या 86/2017 और
आरबीई 129/2017 के अनुसार
अनुभाग नियंत्रक और मुख्य नियंत्रक ₹ 5000/- प्रति माह पर विशेष ट्रेन नियंत्रक भत्ते के हकदार हैं।
यह भत्ता 01.07.2017 से स्वीकार्य है।
हर बार डीए 50 प्रतिशत
बढ़ने पर यह भत्ता 25 प्रतिशत बढ़ जाएगा।
Control office Planning, Execution, Review & Telecommunication
PLANNING
2. Forecast of trains to be run section wise;
3. Forecast of supply of empties for bulk loading transshipment, etc.;
4. Forecast of unloading; & Release of inward loaded rakes placed for Unloading
5. Planning for engineering blocks and special moves.
Control Charting & Method of Charting
CHARTING:
1) Goods Path - Requiring minimum running time.
2) Auxiliary Path- Suitable for short distances
3) Bad Path - Shall not be used except in case of emergency because it occupies maximum time.
For the purpose of Section Capacity the paths of scheduled trains and goods paths are only taken into consideration and the number arrived at, shall not be less than the number obtained by Scott’s Formula. If so, it is considered as lead charting and requires revision.
Method of Charting:
Every chart is printed for 8 Hours which shall by chart neatly and legibly in the following manner:Checking of Control Charts:
Chart reading brings out the following:
Late Starts;Cross working of light engines etc.,
Master Charts & Preparation of Master Charts
Master Charts:
Preparation of Master Charts
Trace out the paths of Passenger/Mail/Express Trains keeping in mind the timings necessary at divisional and zonal interchange points.The following points are to be kept in mind while preparing Master Charts:
(a) The Capacity of originating yard in forming trains and starting them.(b) The capacity at the terminals to receive the trains (Availability of platform lines, Pit line, TXR lines etc)
(c) Facilities at enroute for crossing or precedence.
(d) Spreading out evenly occupation of Block Section to avoid bottlenecks, if trains run late.
Integrated Blocks:
Traffic Corridor Block:
Control Office Application (कंट्रोल आफिस एप्लीकेशन) (COA)
Basic Function of control of Railway
Basic Functions of
Control:
1. Train Control: This job is done by SCOR (Section Controller).Supervising & regulating movement of trains from station to station on the section to avoid delay to trains and to maximize utilisation of the capacity of the section by: -
(a) Monitoring movement of
trains from station to station and recording paths and detention on COA.
(b) Arranging crossing and
precedence of trains judiciously.
(c) Arranging working of
departmental and material trains.
(d) Giving time signal to all
stations on the section daily at appointed time
(e) Fulfilling interchange
commitment.
(f) Arranging proper movement
of assisting/ banking / light engines.
(g) Clearance of sick wagons
from Roadside stations.
(h) Arrangement of relief for
10 hrs duty staff.
(i) Incident management on rail network & at station
(j) Arranging Engineering
and/or power blocks in such a way as to involve minimum disturbance to train
running.
(k) Maintaining fluidity of
yards by controlling the flow of stock in and out of yard
(l) Arranging Speedy relief in
case of accidents.
2. Traffic Control
is the general and over-riding control for supervision of the movement of goods
and coaching traffic on the section. It is exercised by :
(a) Collecting information
from the various stations on the section in respect of –
(i) Registration for wagons
outstanding at stations and arrangements for supply of wagons.
(ii) Number of wagons loaded
and empty wagons/rakes awaiting despatch.
(b) Arranging running,
regulation, putting back and cancellation of trains.(both freight &
coaching)
(c) Securing maximum loads for
trains.
(d) Collecting stock position
from the different stations, marshalling and terminal yards.
(e) Arrangement of Crew &
Guard for freight trains
(f) To keep liaison with
adjoining Railways and Divisions for interchange commitments
(g) Monitoring and
coordinating working of yards, goods sheds sidings, loco-shed, TXR depots etc.
(h) Supervising of stock
control.
(i) Arranging supply of wagons
against pending registration.
(j) Securing optimum
utilisation of stock, with minimum detention.
(k) To ensure optimum
utilisation of loco and staff.
(l) To arrange ART & Crane
from adjoining Railway/ Division in case of accidents and other coordination.
3. Power Control -
Power Control is
responsible for provision of motive power to all trains by maintaining position
of locomotives.
(a) Requisitioning engines
from loco sheds for all operating requirements, i.e. Train working, Shunting
and Banking.
(b) Ensuring most economical
use of engines by close supervision both in Traffic Yards and sheds.
(c) Ensuring the return of
engines to “Home Sheds” at regular intervals for servicing and maintenance.
(d) Ensuring an even balance
of engines and crews between running sheds for meeting demands of traffic,
(e) Ensuring that light engine
kilometres is kept to the minimum.
(f) Providing guidance to
running staff for troubleshooting.
4. Carriage and Wagon -
Carriage and
Wagon Control is responsible to assist the train and traffic control and to:
(a) Ensure timely examination
and fitness of all trains
(b) To keep a watch over the
detachment of sick wagons/coaches and to arrange for their early repair and
fitness.
(c) Keeping a watch over
availability of vital C&W components, like Air Hoses, Washers, Clamps etc..
and efficient working of equipments & machines in C&W depot to avoid
detention to trains.
(d) To keep a watch over
placement of wagons /coaches in sick line and their release.
(e) To keep account of
detention to trains on C&W account and take remedial action.
(f) To provide guidance to
running staff for trouble shooting.
(g) For Electrical Multiple Units, this function is performed by Traction Loco Controller (TLC).
(h) Monitor the movement of
POH due stock to workshops
5. Commercial Control
Commercial
Control assists the Traffic and Train Control:
(a) To expeditiously dispose off unclaimed and unconnected wagons, parcel consignments.
(b) To keep a watch on detention to trains on Commercial account like Alarm Chain Pulling, Carriage watering, Parcel working etc., and take remedial measures.
(c) To ensure quick
transhipment of sick wagons by arranging matching stock and labour.
(d) To keep a watch over
submission of station returns.
(e) Monitoring of public
complaints lodged at the stations.
(f) To ensure proper
maintenance of public amenities available at stations.
(g) Any other job entrusted by
Sr. DCM/ DCM.
6. Traction Power Contro
Traction Power
Control is provided to assist in Traffic and Train Control for:
(a) Arranging maintenance
blocks for OHE
(b) Arranging alternative
power supply in case of tripping etc., through remote control.
(c) Monitoring OHE failures
and taking remedial action.
(d) Monitoring detention of
trains on OHE accounts.
(e) Guiding running/ station
staff in trouble shooting.
7. Engineering
Control: Monitors imposition & cancellation of Engineering
Restrictions, Working of track machines & monitoring integrated
maintainable blocks. To co-ordinate works during maintenance blocks Running of
Material trains.
8. Signal Control
assists Traffic and Train Control and is required :
a) To keep a watch over the S&T failures
and take remedial action.
b) To ensure efficient working
of communication channels
9. Security Control is responsible for prevention of theft of property and assists passengers in trains/stations.
10. Crew Control:
12. ETL Control:
Functions of Traffic Control: The main functions of Traffic Control are:
a) Continuous supervision of
the movement of all traffic in the controlled area with a view to achieve the
maximum possible operating efficiency.
b) Systematic input of data to
COA for maintenance of accurate charts of train movements and arrangements of
crossing and precedence to the greatest advantage.
c) Analysis of detentions to
trains
d) Planning, ordering and
running of goods trains to the best possible paths.
e) Maintaining the fluidity of
marshalling yards/freight terminals.
f) Taking remedial action in
the event of yard/terminal congestion.
g) Elimination of avoidable
detentions to goods stock at loading and unloading points and at transhipment
stations.
h) Allotment and distribution
of goods stock to stations,
i) Supply of information to
adjoining controls, terminals and engine changing stations regarding the
movements of trains to enable adequate timely arrangements for their reception
and onward despatch.
j) Arranging of engineering
and other departments blocks with minimum detention to traffic.
k) Running of material trains
and other track machines, tower wagons etc.
l) Arranging relief for engine
crews and Guards.
m) Ensuring maximum
utilisation of locomotives.
n) Issuing instructions for
train working in case of equipment failures and whenever abnormal methods or
working have to be resorted to.
o) Speedy arrangements for
relief rescue and restoration in the event of accident.
p) To assist in the realistic
planning of time tables and punctual running of passenger trains in
coordination with various departments, other divisions and other railways.
q) To keep a watch over
damaged stock at road side stations, yards and sick lines and to ensure that
they are promptly attended to
r) To rectify immediately the
irregularities on the part of line staff and provide them necessary guidance.
s) To provide operations
management information.
t) To ensure smooth functioning of COA and other IT applications
Control Organisation
The Control Organization of Indian Railways is the nerve centre of train operations. It controls the asset management of the Railways, in a dynamic situation, round the clock incessantly moving trains on its entire network. It has come a long way from being an exclusively telephone-based system emerging in the form of an Information Technology enabled organization.
This basic structure of Operating Control on Indian Railways exists at the Divisional Level, which has also been extended to Area Control levels. In addition, Central Control Office is situated in the headquarters office and one at Railway Board.
The area spread of a division is divided into control sections, each section having a given number of stations. The two-way telephone system, also called an omnibus circuit which permits all stations to have direct communication with Section Controller, who is responsible for train regulation in his area. The section Controller can speak to all stations at the same time or to one station selectively, using individual numbers/ buttons.
इमरजेंसी कंट्रोल (Emergency control) एवं इमरजेंसी कंट्रोल का कार्य
इमरजेंसी कंट्रोल (Emergency control) एवं इमरजेंसी कंट्रोल का कार्य
समय पालन से केवल यात्री गाड़ी की गुणवत्ता ही नही आँकी जाती बल्कि सम्पूर्ण रेलवे की छवि का निर्धारण भी जनता इसी से करती है. अत: समय पालन सुनिश्चित करने के लिए क्षेत्रीय रेल स्तर पर एक इमरजेंसी कंट्रोल की स्थापना की गयी है, जो CPTM के प्रति जवाबदेही होता है- (इसकी स्थापना मुख्यत: मिलिट्री ट्रेफिक को ध्यान में रखकर की गयी थी.)
आज के सन्दर्भ में इमरजेंसी कंट्रोल के मुख्य कार्य निम्न है -
1. यात्री गाड़ियाँ जैसे में/एक्स, सुपर फास्ट, समर स्पेशल, सवारी गाडी आदि का नियंत्रण करना.
2. मिलिट्री स्पेशल, वीवीआइपी स्पेशल, निजी पार्टियों व्दारा बुक गाडियों के संचालन की निगरानी.
3. मिलेनियम पार्सल ट्रेन, पेरिशेबल गुड्स स्पेशल के संचालन की निगरानी.
4. सभी गाडियों का मंडलो से समय पालन प्राप्त करना निरीक्षण करना तथा गणना करके रेलवे बोर्ड को भेजना
5. उप नगरीय गाडियों के समय पालन पर निगरानी रखना.
6. अतिरिक्त कोच लगाने संबंधित आदेश जारी करना.
7. प्राकृतिक आपदा, दुर्घटना आदि के समय गाडियों का डायवर्शन के लिए दिशा निर्देश जारी करना.
8. मंडल, दुर्घटना स्थल एवं रेलवे बोर्ड के बीच समन्वय स्थापित करना तथा सूचनाओ का आदान - प्रदान करना.
9. युध्द आदि आपात परिस्थितियों में विभिन्न मंडलो तथा रेलवे बोर्ड के बीच समन्वय बनाना.
10. क्षेत्रीय रेलवे पर मौसम संबंधित जानकारी प्राप्त करके अन्य मंडलो को देना.
11. हालीडे स्पेशल, इंस्पेक्शन कैरेज, पार्टी सैलून आदि के मूवमेंट पर नजर रखना और आवश्यक दिशानिर्देश जारी करना,
12. रेलवे बोर्ड व्दारा जारी दिशानिर्देशो को संबंधित मंडलो को देना.
13. गाडियों का विलम्ब तथा पंक्चुएलिटी परफार्मेंश जोनल स्तर पर ज्ञात करके रेलवे बोर्ड को सूचित करना.
14. दुर्घटना, डायवर्शन, केंसीलेशन, GM स्पेशल मूवमेंट के बारे में COM को सूचना देना.
ट्रेन मैनेजमेंट सिस्टम (TRAIN MANAGEMENT SYSTEM)
TMभारतीय रेल में मुंबई उपनगरीय सेक्शन को मुंबई का लाइफ लाइन कहा जाता है जिसका श्रेय मुंबई उपनगरीय क्षेत्र में चलने वाली लोकल ट्रेनो को जाता है. यह खंड अत्यधिक व्यस्त होने के कारण, गाड़ी का संचालन करना दिन - प्रतिदिन कठिन होता जा रहा था. इसी को ध्यान में रखते हुये मुंबई उपनगरीयसेक्शन को एक ऐसी प्रणाली की आवश्यकता महसूस की जा रही थी, जो संरक्षा, समयपालन, शीघ्र निर्णय आदि संचालनिकगतिविधियो पर खरा उतरे) इसी बात को ध्यान में रखते हुये भारतीय रेल ने और जर्मनी की ब्रोम्बाडियर कंपनी के साथ मिलकर ट्रेन मैनेजमेंट सिस्टम (TMS) को अपनाने हेतु निर्णय लिया.
ट्रेन मैनेजमेंट सिस्टम (TMS) भारतीय रेल में सर्वप्रथम पश्चिमी रेलवे व्दारा कार्यान्वित की गई, जिसे मध्य रेलवे व्दारा भी संचालित किया जा रहा है, जिसके तहत उपनगरीय ट्रेन संचालनो के साथ - साथ मेल/ एक्सप्रेस गाडियों हेतु एकीकृत प्रबंधन और सिंगनलिंग की निगरानी के साथ - साथ इत्यादि कार्य सफलता पूर्वक किया जा रहा है.
वर्तमान में मध्य रेलवे में सीएसटी मुंबई से कल्याण तक के बड़े हिस्से को ट्रेन मैनेजमेंट सिस्टम (TMS) व्दारा संचालित किया जा रहा है, इसके साथ ही चार अतिरिक्त छोटे खंडो जिसमे कल्याण से अम्बिबली (इगतपुरी साइड), कल्याण से अम्बरनाथ (पुणे की ओर), डोंबीवली से भिवंडी रोड, और दिवा से दाटीवल्ली कार्ड केबिन (पनबेल की तरफ ) तक संचालित किये जाना प्रस्तावित है.
TMS लगाने की आवश्यकता -
1. अत्याधिक व्यस्त मार्ग होने के कारण.
2. ज्यादा गाडियों को संरक्षा पूर्वक संचालन करने हेतु.
3. गाडीयों पर कुशलता पूर्वक नियंत्रण रखने हेतु.
4. रेल संसाधनो का अधिकतम उचित उपयोग सुनिश्चित करने हेतु.
5. यात्रियों को गाड़ी की सटीक जानकारी उपलब्ध कराने हेतु.
ट्रेन मैनेजमेंट सिस्टम से लाभ -
1. गाडियों के चल स्थिति की जानकारी डिस्प्ले बोर्ड के माध्यम से मिलने के कारण लगातार उनकी मानिटरिंग की जाती है.
2. स्टेशन मास्टर को गाडियों के चल स्थिति की जानकारी डिस्प्ले बोर्ड के माध्यम से मिलने के कारण, निर्णय लेने की सुविधा होती है.
3. स्टेशन मास्टर व्दारा किये गये गलत क्रासिंग, अग्रता आदि की जानकारी टी.एम.एस. सेंटर में बैठे कंट्रोलर को आन लाइन मिलने के कारण गलती तुरंत सुधारी जाती है
4. इस प्रणाली में किसी भी तरह का फेल्युर होने पर उसकी तुरंत जानकारी हो जाती है, जिससे उसे दुरस्त करने में आसानी हो जाती है.
5. इस प्रणाली के माध्यम से उपनगरीय क्षेत्रो में यात्रा करने वाले यात्रियों को उनके ट्रेन की सटीक जानकारी स्टेशनों पर लगे डिस्प्ले बोर्ड के माध्यम से मिलती रहती है.
ट्रेन कंट्रोल एव गाड़िया संचालन में कंट्रोल के जिम्मदारी
ट्रैन कंट्रोल (Train Control)
रेलवे में ट्रेन संचालन एवं कंट्रोल का कार्य SCOR व्दारा किया जाता है। मण्डल के प्रत्येक खंड के सबंधित नियंत्रक के पास उसके खंड से संबंधित मास्टर चार्ट होता है, जिसमें मेल/एक्स, सवारी गाड़ियों, मालगाड़ियों के पथ को दर्शाने हेतु विभिन्न रंगो चार्ट रहते है।
यह मास्टर चार्ट खंड नियंत्रक को अग्रिम योजना बनाने में मदद करता है। ट्रैन कंट्रोल के माध्यम से गाड़ियों के चलन से संबंधित सूचनाये आवश्यकतानुसार आगे के SM/ LOBBY को दी जाती है। खंड नियंत्रक गाड़ियों के महत्व को ध्यान में रखते हुए क्रासिंग एवं अग्रता के निर्देश संबंधित स्टेशन मास्टर को देता है .
