SR 3.51-2 WORKING OF TRAINS DURING OVERHAULING
- When a lever frame, SM’s control frame of inter locked key box or any other interlocking frame is to be overhauled, temporary working instruction for each phase of work shall be prepared jointly by DOM and DSTE for working of traffic during such overhauling.
- The SM shall be responsible for ensuring that all the facing points over which the train will pass, are correctly set, clamped and pad locked and that all trailing points over which the train will pass are correctly set before taking OFF the signals. The manner in which the SM will ensure this must be clearly laid down.
- A notification showing the date & time when the overhauling work would be taken in hand, its probable duration and instruction for the SM to issue Caution Order to LP and for Loco Foreman to advise the LP to observe the temporary speed restriction must be issued jointly by the DSTE and DOM.
