Operating Department Smart Search


Sort :
Loading...
Go to Page :

G&SR की महत्वपूर्ण परिभाषाएँ – Part 3 | नियम 1.02 की परिभाषाएँ 41 से 60

 G&SR की महत्वपूर्ण परिभाषाएँ – Part 3

नियम 1.02 की परिभाषाएँ 41 से 60 | Railway Operating Department LDCE Exam

भारतीय रेलवे के Operating Department LDCE, GDCE एवं अन्य Departmental Examinations की तैयारी में G&SR Rule 1.02 – Definitions का विशेष महत्व है।

Part-1 में हमने Definition No. 1 से 20 तथा Part-2 में Definition No. 21 से 40 का अध्ययन किया था। इस तीसरे और अंतिम भाग में Definition No. 41 से 60 को मूल G&SR परिभाषा, सरल हिन्दी व्याख्या, आवश्यक उदाहरण और LDCE Exam Point के साथ समझेंगे।

इस भाग में Obstruction, Running Line, Running Train, Shunting, Special Instructions, Station, Station Limits, Station Master, Subsidiary Rules, System of Working, Track Circuit और Train जैसी अत्यंत महत्वपूर्ण Operating definitions शामिल हैं।

G&SR Rule 1.02 – Definitions.

41. बहु-संकेती सिगनल व्यवस्था

(Multiple Aspect Signalling)

मूल G&SR परिभाषा

‘बहु-संकेती सिगनल व्यवस्था’ का अभिप्राय ऐसी सिगनल व्यवस्था से है जिसमें सिगनल एक समय में तीन या अधिक संकेतों में से किसी एक संकेत को प्रदर्शित करे और जिसमें प्रत्येक सिगनल संकेत की पिछले सिगनल या सिगनलों के संकेत द्वारा पूर्व चेतावनी मिले।

सरल हिन्दी में व्याख्या

Multiple Aspect Signalling ऐसी signalling system है जिसमें signal तीन या उससे अधिक possible aspects में से किसी एक aspect को display कर सकता है।

इसके साथ ही आगे आने वाले signal indication की Advance Warning पिछले signal या signals के माध्यम से मिलती है।

LDCE Exam Point

दो बातें विशेष रूप से याद रखें—

Three or More Aspects + Advance Warning

इसे Definition No. 60 Two-Aspect Signalling के साथ comparison में पढ़ें।

42. रात (Night)

मूल G&SR परिभाषा

‘रात’ का अभिप्राय सूर्यास्त से सूर्योदय तक का समय है।

सरल हिन्दी में व्याख्या

G&SR में Night का अर्थ—

Sunset to Sunrise है।

इसे Part-1 की Definition No. 17 Day के साथ याद करें।

Day = Sunrise to Sunset

Night = Sunset to Sunrise

LDCE Exam Point

Day और Night दोनों की definitions एक साथ तैयार करें।

43. अवरोध (Obstruction)

मूल G&SR परिभाषा

‘अवरोध’ तथा सजातीय पदों के अन्तर्गत, लाइन पर या उसका उल्लंघन करने वाली कोई गाड़ी, वाहन या कोई अन्य अवरोध या कोई ऐसी स्थिति, जो गाड़ियों के लिए संकटजनक है।

सरल हिन्दी में व्याख्या

Obstruction का अर्थ केवल track पर खड़ी train या vehicle नहीं है।

ऐसी कोई भी—

Train, Vehicle, Object या Condition

जो line को obstruct/foul करती हो या trains की safe movement के लिए खतरा उत्पन्न करती हो, Obstruction के अंतर्गत आ सकती है।

उदाहरण

यदि कोई vehicle ऐसी स्थिति में खड़ा है जिससे Running Line foul हो रही है, तो वह obstruction हो सकता है।

इसी प्रकार track पर ऐसी unsafe condition जो train movement के लिए danger पैदा करती हो, definition के अनुसार obstruction के दायरे में आ सकती है।

LDCE Exam Point

Obstruction = Train/Vehicle/Other Obstruction + Dangerous Condition

यह definition Operating Department के लिए अत्यंत महत्वपूर्ण है।

44. शिरोपरी उपस्कर

(Overhead Equipment – OHE)

मूल G&SR परिभाषा

‘शिरोपरी उपस्कर’ का अभिप्राय रेलपथ के ऊपर लगे हुए विद्युत चालकों (Conductors), उनके सहायक fittings सहित विद्युत रोधक (Insulators) और अन्य संयोजकों से है जिनके सहारे वे विद्युत कर्षण के लिए लटकाए जाते हैं तथा अपनी जगह टिके रहते हैं।

सरल हिन्दी में व्याख्या

Overhead Equipment (OHE) railway track के ऊपर स्थित electrical traction system से संबंधित equipment है।

इसमें मुख्य रूप से—

Electrical Conductors, Insulators, Supporting Fittings और अन्य supporting arrangements

शामिल होते हैं।

LDCE Exam Point

OHE का संबंध Electric Traction से है।

45. यात्री गाड़ी (Passenger Train)

मूल G&SR परिभाषा

‘यात्री गाड़ी’ का अभिप्राय केवल या मुख्यतः यात्रियों और अन्य कोचिंग यातायात के वहन के काम में लाई जाने वाली गाड़ी से है तथा इसके अन्तर्गत सैनिक गाड़ी भी है।

सरल हिन्दी में व्याख्या

ऐसी train जिसका उपयोग केवल या मुख्यतः Passengers तथा other Coaching Traffic के transportation के लिए किया जाता है, Passenger Train कहलाती है।

इस definition में Military Train (सैनिक गाड़ी) भी शामिल है।

LDCE Exam Point

Passenger Train की definition में Military Train भी included है।

46. कांटा और ट्रैप संकेतक

(Point and Trap Indicators)

मूल G&SR परिभाषा

‘कांटा और ट्रैप संकेतक’ सिगनल नहीं हैं, किन्तु ये कांटों पर फिट तथा उनके साथ संचालित होकर रात या दिन में कांटों की दिशा बताने वाले उपकरण हैं।

सरल हिन्दी में व्याख्या

Point and Trap Indicators Signals नहीं हैं।

ये Points के साथ fitted और operated devices होते हैं, जिनका काम दिन या रात में Points की position/direction बताना है।

LDCE Exam Point

यहाँ सबसे महत्वपूर्ण बात—

Point and Trap Indicator ≠ Signal

47. परिचालित लाइन (Running Line)

मूल G&SR परिभाषा

‘परिचालित लाइन (Running Line)’ का अभिप्राय एक या अधिक सिगनलों द्वारा शासित लाइनों से है और इसके अन्तर्गत वे संयोजक, यदि कोई हैं, जिनका उपयोग गाड़ी द्वारा स्टेशन में प्रवेश करते समय या स्टेशन से प्रस्थान करते समय या किसी स्टेशन को बिना रुके पार करते समय या स्टेशनों के बीच जाते समय किया जाता है।

सरल हिन्दी में व्याख्या

Running Line ऐसी line है जो एक या अधिक signals द्वारा governed होती है और जिसका उपयोग trains द्वारा actual running movement में किया जाता है।

इसमें applicable Connections भी शामिल हो सकते हैं जिनका उपयोग train—

Station में प्रवेश करते समय, Station से departure करते समय, Station को बिना रुके pass करते समय अथवा Stations के बीच चलते समय करती है।

LDCE Exam Point

Running Line की definition में केवल Main Line को न समझें।

Signal-governed Lines + Relevant Connections भी definition का हिस्सा हैं।

48. परिचालित गाड़ी (Running Train)

मूल G&SR परिभाषा

‘परिचालित गाड़ी (Running Train)’ का अभिप्राय ऐसी गाड़ी से है जो ‘प्रस्थान प्राधिकार’ के अनुसार प्रस्थान कर चुकी है किन्तु उसने अपनी यात्रा पूरी नहीं की है।

सरल हिन्दी में व्याख्या

कोई train जब applicable Authority to Proceed के अनुसार अपनी journey प्रारंभ कर चुकी हो और अभी अपनी यात्रा पूरी न की हो, तो वह Running Train है।

LDCE Exam Point

Running Train की definition के दो मुख्य elements—

Authority to Proceed के अनुसार departure + Journey अभी complete नहीं हुई।

इसे Definition No. 6 Authority to Proceed से जोड़कर पढ़ें।

49. शंटिंग (Shunting)

मूल G&SR परिभाषा

‘शंटिंग’ का अभिप्राय उस संचालन से है जो इंजन सहित या उसके बिना किसी वाहन या वाहनों का अथवा किसी इंजन का या किसी अन्य स्वनोदित (Self Propelled) वाहन का गाड़ी के साथ जोड़ने, अलग करने या स्थान बदलने या किसी और प्रयोजन के लिए किया जाए।

सरल हिन्दी में व्याख्या

Shunting railway vehicles की ऐसी movement है जो सामान्यतः—

  • Vehicles को train से जोड़ने,
  • अलग करने,
  • एक स्थान से दूसरे स्थान पर ले जाने,
  • Engine की movement,
  • Self-propelled vehicle की movement,
  • या अन्य संबंधित operational purpose

के लिए की जाती है।

यह movement Engine के साथ या बिना Engine भी हो सकती है।

उदाहरण

एक rake में अतिरिक्त coach/wagon जोड़ने के लिए vehicles को move करना Shunting operation का उदाहरण है।

LDCE Exam Point

Shunting को केवल “Engine द्वारा coaches/wagons को आगे-पीछे करना” न समझें।

Definition का scope इससे व्यापक है।

50. विशेष अनुदेश (Special Instructions)

मूल G&SR परिभाषा

‘विशेष अनुदेश’ का अभिप्राय विशेष मामलों या विशेष परिस्थितियों में प्राधिकृत अधिकारी द्वारा समय-समय पर जारी किए जाने वाले अनुदेशों से है।

सरल हिन्दी में व्याख्या

विशेष मामलों या परिस्थितियों के लिए Authorised Officer द्वारा समय-समय पर जारी instructions को Special Instructions कहा जाता है।

महत्वपूर्ण अंतर

इसे Part-1 की Definition No. 4 Approved Special Instructions से confuse नहीं करना चाहिए।

Special Instructions → Authorised Officer

जबकि

Approved Special Instructions → Commissioner of Railway Safety द्वारा Approved/Prescribed

LDCE Exam Point

Special Instructions और Approved Special Instructions का अंतर अत्यंत महत्वपूर्ण है।

51. स्टेशन (Station)

मूल G&SR परिभाषा

‘स्टेशन’ का अभिप्राय रेल लाइन पर उस स्थान से है जहाँ यातायात का प्रबंध किया जाता है या जहाँ ‘संचालन पद्धति’ के अधीन ‘प्रस्थान प्राधिकार’ दिया जाता है।

सरल हिन्दी में व्याख्या

G&SR में Station का अर्थ केवल वह स्थान नहीं है जहाँ passenger train रुकती है।

Station वह place है जहाँ—

Traffic का management किया जाता है, अथवा

applicable System of Working के अंतर्गत Authority to Proceed दिया जाता है।

LDCE Exam Point

Station ≠ केवल Passenger Stoppage

Definition में Traffic Management और Authority to Proceed महत्वपूर्ण हैं।

52. स्टेशन सीमा (Station Limits)

मूल G&SR परिभाषा

‘स्टेशन सीमा’ का अभिप्राय रेल के ऐसे किसी भाग से है जो किसी स्टेशन मास्टर के नियंत्रण में है और जो स्टेशन के बाह्यतम (Outermost) सिगनलों के बीच स्थित है या जो विशेष अनुदेशों द्वारा विनिर्दिष्ट किया जाता है।

सरल हिन्दी में व्याख्या

Station Limits railway का वह निर्धारित portion है जो Station Master के control में होता है।

सामान्य रूप से इसकी सीमा station के Outermost Signals के बीच होती है, अथवा Special Instructions द्वारा निर्धारित की जा सकती है।

विशेष अध्ययन बिंदु

2022 G&SR में Definition No. 52 के बाद SR 1.02(52)-01 में विभिन्न signalling systems तथा Single/Double Line के अनुसार Station Limits के demarcation का विस्तृत प्रावधान दिया गया है।

इसे आगे Station Limits के स्वतंत्र topic में विस्तार से पढ़ना अधिक उपयोगी होगा।

LDCE Exam Point

Station Limits = Station Master Control + Outermost Signals/Special Instructions

53. स्टेशन मास्टर (Station Master)

मूल G&SR परिभाषा

‘स्टेशन मास्टर’ का अभिप्राय ड्यूटी पर तैनात ऐसे व्यक्ति से है जो उस समय स्टेशन सीमा में यातायात के संचालन के लिए जिम्मेदार है और इसके अन्तर्गत ऐसे अन्य व्यक्ति भी हैं जिनके स्वतंत्र प्रभार (Charge) में उस समय सिगनलों का प्रचालन होता है तथा जिन पर लागू संचालन पद्धति के अधीन गाड़ियों के संचालन की जिम्मेदारी है।

सरल हिन्दी में व्याख्या

G&SR में Station Master का अर्थ केवल designation से Station Master नहीं है।

Definition का मुख्य आधार है—

उस समय Station Limits के भीतर Traffic Working की responsibility।

इसके अंतर्गत वह अन्य person भी आ सकता है जिसके independent charge में signals का operation तथा applicable System of Working के अनुसार train working की responsibility हो।

LDCE Exam Point

Station Master की definition designation से अधिक responsibility-based है।

यह Operating LDCE की अत्यंत महत्वपूर्ण definition है।

54. स्टेशन सेक्शन (Station Section)

मूल G&SR परिभाषा

‘स्टेशन सेक्शन’ का अभिप्राय स्टेशन सीमाओं के ऐसे सेक्शन से है जो निर्धारित signalling arrangement के अनुसार विनिर्दिष्ट होता है।

2022 G&SR में इसके बाद विभिन्न signalling systems के लिए Station Section की विस्तृत सीमाएँ दी गई हैं।

सरल हिन्दी में व्याख्या

Station Section को केवल Station Limits का दूसरा नाम नहीं समझना चाहिए।

यह Station Limits के भीतर निर्धारित portion है जिसकी सीमा लागू signalling system, station class और Single/Double Line arrangement के अनुसार निर्धारित होती है।

उदाहरण के लिए G&SR में Two-Aspect signalling वाले B-Class Station तथा Multiple-Aspect/Modified Lower Quadrant signalling वाले B-Class Station के लिए अलग-अलग arrangements दिए गए हैं।

LDCE Exam Point

Station Limits और Station Section एक ही चीज नहीं हैं।

इस topic को आगे Station Classification और Signalling के साथ विस्तार से पढ़ना चाहिए।

55. सहायक नियम (Subsidiary Rule)

मूल G&SR परिभाषा

‘सहायक नियम’ का अभिप्राय उस विशेष अनुदेश से है जो तत्संबंधी साधारण नियम का सहायक है तथा किसी साधारण नियम से अलग नहीं है।

सरल हिन्दी में व्याख्या

Subsidiary Rule (SR) संबंधित General Rule (GR) की सहायता और उसके practical application के लिए होता है।

SR को संबंधित General Rule से अलग या उसके विपरीत नहीं समझा जाना चाहिए।

संबंधित SR में यह भी स्पष्ट किया गया है कि पुस्तक में दिए गए Subsidiary Rules को General Rules के साथ पढ़ा जाना है और कर्मचारियों पर उनकी बाध्यता है।

LDCE Exam Point

SR → संबंधित GR का Supplement; GR से अलग नहीं।

G&SR का अर्थ समझने के लिए यह definition अत्यंत महत्वपूर्ण है।

56. संचालन पद्धति (System of Working)

मूल G&SR परिभाषा

‘संचालन पद्धति’ का अभिप्राय रेल के किसी भाग पर गाड़ियों के संचालन के लिए तत्समय अपनाई गई पद्धति से है।

सरल हिन्दी में व्याख्या

Railway के किसी particular section पर trains को safely operate करने के लिए उस समय जो prescribed system लागू है, उसे System of Working कहा जाता है।

G&SR में आगे अलग-अलग Systems of Working के विस्तृत rules दिए गए हैं।

LDCE Exam Point

System of Working = उस समय Railway के संबंधित भाग पर Train Working के लिए adopted system.

यह Operating Department के पूरे syllabus की core definition है।

57. ट्रैक सर्किट (Track Circuit)

मूल G&SR परिभाषा

‘ट्रैक सर्किट’ का अभिप्राय विद्युत के उस परिपथ (Circuit) से है जो रेलपथ के किसी भाग पर किसी वाहन की उपस्थिति ज्ञात करने के लिए लगाया जाता है तथा रेलपथ की पटरियाँ परिपथ (Circuit) का अंश मानी जाती हैं।

सरल हिन्दी में व्याख्या

Track Circuit एक electrical circuit है जिसका उपयोग track के निर्धारित portion पर railway vehicle की presence detect करने के लिए किया जाता है।

इसमें rails स्वयं electrical circuit का हिस्सा होती हैं।

उदाहरण

यदि किसी track-circuited portion पर train/vehicle मौजूद है, तो Track Circuit उसकी presence detect करने की signalling arrangement का हिस्सा बनता है।

LDCE Exam Point

Track Circuit → Vehicle Detection + Rails form part of Electrical Circuit

साथ-साथ पढ़ें

Track Circuit ↔ Axle Counter

दोनों track occupancy detection से संबंधित हैं, लेकिन उनकी working principle अलग है।

58. गाड़ी (Train)

मूल G&SR परिभाषा

‘गाड़ी’ का अभिप्राय वाहनों के साथ या उनके बिना, कोई इंजन अथवा ट्रेलर सहित या उसके बिना, ऐसे स्वनोदित (Self Propelled) वाहन से है, जिसे रेलपथ से आसानी से नहीं उठाया जा सकता है।

सरल हिन्दी में व्याख्या

G&SR में Train का अर्थ केवल locomotive के साथ coaches/wagons की लंबी formation नहीं है।

Definition के अनुसार इसमें—

Engine with or without Vehicles

तथा निर्धारित प्रकार का Self-Propelled Vehicle

भी शामिल हो सकता है, जिसे track से आसानी से हटाया नहीं जा सकता।

LDCE Exam Point

Train ≠ केवल Engine + Coaches/Wagons

इस definition का scope व्यापक है।

59. गाड़ी परीक्षक (Train Examiner)

मूल G&SR परिभाषा

‘गाड़ी परीक्षक (Train Examiner)’ का अभिप्राय ऐसे रेल सेवक से है जो गाड़ियों की परीक्षा करने और यह प्रमाणित करने के लिए विधिवत रूप से योग्यता प्राप्त है कि वे निरापद परिचालन के उपयुक्त हैं और इसके अन्तर्गत ऐसा कोई अन्य रेल सेवक भी है, जो उस समय गाड़ी परीक्षक की ड्यूटी कर रहा है।

सरल हिन्दी में व्याख्या

Train Examiner ऐसा duly qualified Railway Servant है जिसका कार्य train की examination करना और यह certify करना है कि train Safe Operation के लिए fit है।

Definition में वह अन्य Railway Servant भी शामिल है जो उस समय नियमानुसार Train Examiner की duty कर रहा हो।

LDCE Exam Point

Train Examiner → Examination + Certification for Safe Operation

60. द्वि-संकेती सिगनल व्यवस्था

(Two-Aspect Signalling)

मूल G&SR परिभाषा

‘द्वि-संकेती सिगनल व्यवस्था’ का अभिप्राय उस सिगनल व्यवस्था से है जिसमें प्रत्येक सिगनल, किसी एक समय में दो संकेतों में से कोई एक संकेत प्रदर्शित करता है।

सरल हिन्दी में व्याख्या

Two-Aspect Signalling System में प्रत्येक signal किसी एक समय में दो possible aspects में से एक aspect प्रदर्शित करता है।

LDCE Exam Point

इसे Definition No. 41 से comparison में पढ़ें:

Two-Aspect Signalling → Two Aspects

Multiple-Aspect Signalling → Three or More Aspects

यह distinction Signalling के आगे के chapters के लिए महत्वपूर्ण है।

एक नजर में – Definitions 41 से 60

क्र.Definitionयाद रखने योग्य मुख्य बिंदु
41Multiple Aspect SignallingThree or more aspects + Advance Warning
42NightSunset to Sunrise
43ObstructionTrain/Vehicle/Object/Dangerous Condition
44Overhead EquipmentElectric Traction Equipment
45Passenger TrainPassenger/Coaching Traffic; Military Train included
46Point & Trap IndicatorSignal नहीं है
47Running LineSignal-governed line + relevant connections
48Running TrainAuthority to Proceed के बाद journey पूरी होने तक
49ShuntingVehicles/Engine की specified movement
50Special InstructionsAuthorised Officer द्वारा जारी
51StationTraffic management/Authority to Proceed
52Station LimitsStation Master के control वाला specified railway portion
53Station MasterStation Limits में Traffic Working का responsible person
54Station SectionStation Limits का specified section
55Subsidiary RuleGeneral Rule का सहायक
56System of WorkingTrain Working के लिए adopted system
57Track CircuitVehicle presence detection
58TrainEngine/Self-propelled vehicle आदि
59Train ExaminerSafe operation के लिए examination/certification
60Two-Aspect Signallingदो aspects में से एक

⭐ Operating LDCE Exam के लिए अत्यधिक महत्वपूर्ण Definitions

Part-3 में कई definitions सीधे Operating Rules, Signalling और Block Working की foundation हैं। इनमें निम्न definitions पर विशेष ध्यान देना चाहिए:

1. Obstruction (अवरोध) — केवल train/vehicle नहीं; train movement के लिए dangerous condition भी definition में शामिल है।

2. Running Line (परिचालित लाइन) — Signal-governed lines तथा संबंधित Connections की concept अच्छी तरह समझें।

3. Running Train (परिचालित गाड़ी)Authority to Proceed के अनुसार departure और journey not completed इसके मुख्य elements हैं।

4. Shunting — Definition का scope बहुत व्यापक है। Engine के साथ या बिना vehicles की विभिन्न movements इसमें शामिल हो सकती हैं।

5. Special Instructions — इसे Approved Special Instructions से अलग पहचानना अत्यंत महत्वपूर्ण है।

6. Station — Station का अर्थ केवल passenger stopping place नहीं है। Traffic management और Authority to Proceed इसकी definition के महत्वपूर्ण आधार हैं।

7. Station Limits — Station Master का control तथा Outermost Signals/Special Instructions विशेष रूप से याद रखें।

8. Station Master — Definition designation से अधिक operational responsibility पर आधारित है।

9. Station Section — इसे Station Limits के समान न समझें। दोनों में अंतर समझना Operating LDCE के लिए महत्वपूर्ण है।

10. Subsidiary Rule (SR) — SR संबंधित General Rule का सहायक है और उससे अलग नहीं है।

11. System of Working — Operating Department के लिए सबसे महत्वपूर्ण foundational definitions में से एक है।

12. Track Circuit — Vehicle detection तथा rails के electrical circuit का हिस्सा होने की बात याद रखें।

13. Train — G&SR में Train की definition सामान्य बोलचाल की “train” से अधिक व्यापक है।

14. Multiple Aspect Signalling और Two-Aspect Signalling — दोनों definitions को comparison में तैयार करें।

विशेष रूप से साथ-साथ पढ़ें

Day ↔ Night

Approved Special Instructions ↔ Special Instructions

Authorised Officer ↔ Special Instructions

Station ↔ Station Limits ↔ Station Section ↔ Station Master

Authority to Proceed ↔ Running Train

Running Line ↔ Main Line

Axle Counter ↔ Track Circuit

Multiple Aspect Signalling ↔ Two-Aspect Signalling

General Rule ↔ Subsidiary Rule

इन linked definitions को आपस में जोड़कर पढ़ने से आगे के Signalling, Block Working, Station Working और Systems of Working के chapters समझना काफी आसान हो जाता है।

Operating Department LDCE के लिए इन 60 definitions को पढ़ लेना ही अंतिम उद्देश्य नहीं है। आगे syllabus में जब Signals, Station Working, Block Working, Systems of Working, Shunting, Level Crossing, Train Working और Accident/Abnormal Working आएँगे, तब संबंधित definitions को फिर से उनके actual rules के साथ जोड़कर पढ़ेंगे।

इससे definitions केवल याद नहीं रहेंगी, बल्कि उनका practical operational meaning भी स्पष्ट होगा।

आधार संदर्भ: G&SR अध्याय-I, नियम 1.02 – परिभाषाएँ।

Research & Content: G. D. Pandey


G&SR Important Definitions – Part 3

Rule 1.02: Definitions 41 to 60 | Railway Operating Department LDCE Exam

The General and Subsidiary Rules (G&SR) are fundamental to the study of Railway Operating Department LDCE, GDCE and other Departmental Examinations.

In Part 1, we covered Definitions 1 to 20, while Part 2 covered Definitions 21 to 40, along with the newly inserted Definition 28A – IR-ATP (Kavach).

In this third and final part, we will study Definitions 41 to 60. This section contains several highly important Operating terms, including Multiple-Aspect Signalling, Obstruction, Running Line, Running Train, Shunting, Special Instructions, Station, Station Limits, Station Master, Subsidiary Rule, System of Working, Track Circuit and Train.

41. Multiple-Aspect Signalling

Official G&SR Definition

“Multiple-aspect signalling” means a signalling arrangement in which signals display at any one time any one of three or more aspects and in which the aspect of every signal is pre-warned by the aspect of the previous signal or signals.

Simple Explanation

Multiple-Aspect Signalling is a signalling system in which a signal can display one of three or more aspects at a time.

Another important feature is that the indication of a signal is pre-warned by the previous signal or signals.

Thus, the Loco Pilot gets advance information about the indication that may be expected ahead.

LDCE Exam Point

Remember two essential features:

Three or More Aspects + Pre-warning by Previous Signal/Signals

Study it together with Definition 60 — Two-Aspect Signalling.

42. Night

Official G&SR Definition

“Night” means from sunset to sunrise.

Simple Explanation

For the purpose of G&SR, Night means the period beginning at Sunset and ending at Sunrise.

It should be studied together with the definition of Day.

LDCE Exam Point

Day = Sunrise to Sunset

Night = Sunset to Sunrise

This is a simple but direct examination-oriented definition.

43. Obstruction

Official G&SR Definition

“Obstruction” and its cognate expressions include a train, vehicle or obstacle on or fouling a line, or any condition which is dangerous to trains.

Simple Explanation

The meaning of Obstruction is much wider than merely a train or vehicle standing on the track.

It includes—

  • a Train,
  • a Vehicle,
  • any other obstacle on the line,
  • anything fouling the line, or
  • any condition dangerous to trains.

Therefore, even if no physical vehicle is standing on the track, a dangerous condition affecting safe train movement can come within the meaning of Obstruction.

Example

A vehicle standing in a position that fouls the Running Line may constitute an obstruction.

Similarly, a dangerous condition affecting the safe passage of trains may also fall within this definition.

LDCE Exam Point

Obstruction = Train/Vehicle/Obstacle/Fouling + Any Condition Dangerous to Trains

This is a very important Operating definition.

44. Overhead Equipment

(OHE)

Official G&SR Definition

“Overhead equipment” means the electrical conductors over the track together with their associated fittings, insulators and other attachments by means of which they are suspended and registered in position for the purpose of electric traction.

Simple Explanation

Overhead Equipment (OHE) consists of electrical conductors provided over railway tracks along with the fittings and supporting equipment required for Electric Traction.

It includes associated—

Conductors + Fittings + Insulators + Supporting Attachments

LDCE Exam Point

OHE → Electrical equipment provided for Electric Traction

45. Passenger Train

Official G&SR Definition

“Passenger train” means a train intended solely or mainly for the carriage of passengers and other coaching traffic, and includes a troop train.

Simple Explanation

A train intended solely or mainly for carrying Passengers and other Coaching Traffic is a Passenger Train.

An important part of the definition is that a Troop Train is also included.

LDCE Exam Point

Passenger Train → Passengers/Coaching Traffic + Troop Train included

46. Point and Trap Indicators

Official G&SR Definition

“Point and trap indicators” are not signals, but are appliances fitted to and working with points to indicate by day or by night the position in which the points are set.

Simple Explanation

A Point or Trap Indicator is not a Signal.

It is an appliance associated with Points and is used to indicate the position in which those Points are set.

It can provide such indication during Day as well as Night.

LDCE Exam Point

The most important fact is:

Point and Trap Indicator ≠ Signal

Its function is to indicate the position of Points.

47. Running Line

Official G&SR Definition

“Running line” means the line governed by one or more signals and includes connections, if any, used by a train when entering or leaving a station, or when passing through a station without stopping, or when proceeding between stations.

Simple Explanation

A Running Line is a line governed by one or more signals and used in the actual running of trains.

Its definition also includes relevant Connections, if any, used by a train while—

  • entering a Station,
  • leaving a Station,
  • passing through a Station without stopping, or
  • proceeding between Stations.

Important Concept

Do not assume that Running Line and Main Line are always the same thing.

The definition of Running Line is broader and can include relevant connections used for train movement.

LDCE Exam Point

Running Line = Signal-governed Line + Relevant Connections used by Trains

48. Running Train

Official G&SR Definition

“Running train” means a train which has started under an authority to proceed and has not completed its journey.

Simple Explanation

A train becomes a Running Train when it has started its journey under a valid Authority to Proceed and has not yet completed that journey.

Two elements are therefore essential:

Started under Authority to Proceed + Journey not completed

LDCE Exam Point

Study this definition together with:

Running Train ↔ Authority to Proceed

49. Shunting

Official G&SR Definition

“Shunting” means the movement of a vehicle or vehicles with or without an engine or of any engine or any other self-propelled vehicle, for the purpose of attaching, detaching or transfer or for any other purpose.

Simple Explanation

Shunting is not limited to simply moving coaches or wagons backward and forward.

It includes movement of—

  • Vehicle or Vehicles,
  • with or without an Engine,
  • an Engine itself, or
  • another Self-Propelled Vehicle,

for purposes such as attaching, detaching, transfer or any other operational purpose.

Example

Moving vehicles to attach additional wagons to a formation is a shunting movement.

Similarly, detaching vehicles or transferring them from one line to another may involve shunting.

LDCE Exam Point

Shunting = Movement for Attaching/Detaching/Transfer/Other Purpose

The phrase “with or without an engine” is particularly important.

50. Special Instructions

Official G&SR Definition

“Special instructions” means instructions issued from time to time by the authorised officer in respect to particular cases or special circumstances.

Simple Explanation

Instructions issued by the Authorised Officer for particular cases or special circumstances are called Special Instructions.

This definition should always be compared with Approved Special Instructions.

Important Difference

Special Instructions → Issued by Authorised Officer

Approved Special Instructions → Approved or prescribed by Commissioner of Railway Safety

LDCE Exam Point

The distinction between Special Instructions and Approved Special Instructions is extremely important.

51. Station

Official G&SR Definition

“Station” means any place on a line of railway at which traffic is dealt with, or at which an authority to proceed is given under the system of working.

Simple Explanation

Under G&SR, a Station is not merely a place where passenger trains stop.

A place may qualify as a Station where—

Traffic is dealt with, or

Authority to Proceed is given under the applicable System of Working.

LDCE Exam Point

Remember:

Station = Traffic dealt with OR Authority to Proceed given under System of Working

52. Station Limits

Official G&SR Definition

“Station limits” means the portion of a railway which is under the control of a Station Master and is situated between the outermost signals of the station, or as may be specified by special instructions.

Simple Explanation

Station Limits refer to that specified portion of railway which is under the control of the Station Master.

Normally, this area lies between the Outermost Signals of the Station.

However, Station Limits may also be specified through Special Instructions.

Important Study Point

Station Limits can vary according to the applicable signalling arrangement and station conditions.

Therefore, the detailed rules governing the actual demarcation of Station Limits should be studied separately with the relevant signalling provisions.

LDCE Exam Point

Remember:

Station Limits = Station Master Control + Outermost Signals/Special Instructions

53. Station Master

Official G&SR Definition

“Station Master” means the person on duty who is for the time being responsible for the working of the traffic within station limits, and includes any person who is for the time being in independent charge of the working of any signals and responsible for the working of trains under the system of working in force.

Simple Explanation

Under G&SR, the term Station Master is based on responsibility, not merely designation.

It refers to the person on duty who is responsible for Traffic Working within Station Limits.

It can also include another person who is independently in charge of Signals and responsible for train working under the applicable System of Working.

LDCE Exam Point

Remember three concepts:

Station Limits + Traffic Working + System of Working

This is one of the most important Operating Department definitions.

54. Station Section

Official G&SR Definition

Station Section means the section of Station Limits specified by the applicable signalling arrangement under the General Rules.

Simple Explanation

Station Section and Station Limits are not synonymous.

Station Section is a specified portion within Station Limits, and its extent depends upon factors such as—

  • Class of Station,
  • Single or Double Line,
  • Two-Aspect or Multiple-Aspect Signalling, and
  • applicable signalling arrangement.

Therefore, the exact limits of a Station Section should be studied with the relevant Station Classification and Signalling Rules.

LDCE Exam Point

Station Limits ≠ Station Section

This distinction is very important for Operating examinations.

55. Subsidiary Rule

Official G&SR Definition

“Subsidiary Rule” means a special instruction which is subservient to the General Rule to which it relates and shall not be at variance with any General Rule.

Simple Explanation

A Subsidiary Rule (SR) supplements and assists in the application of the corresponding General Rule (GR).

A Subsidiary Rule cannot be inconsistent with or contrary to a General Rule.

Important Concept

This is fundamental to understanding the entire G&SR structure:

GR = General Rule

SR = Subsidiary Rule supporting the relevant GR

LDCE Exam Point

Subsidiary Rule → Subservient to General Rule + Cannot be at variance with GR

56. System of Working

Official G&SR Definition

“System of working” means the system adopted for the time being for the working of trains on any portion of a railway.

Simple Explanation

The System of Working is the prescribed system adopted at a particular time for the working of trains over a particular portion of railway.

The General Rules provide different Systems of Working for safe train operation under different conditions.

LDCE Exam Point

System of Working = System adopted for Train Working on a portion of Railway

This is one of the core definitions for the Operating Department.

57. Track Circuit

Official G&SR Definition

“Track circuit” means an electrical circuit provided to detect the presence of a vehicle on a portion of track, the rails of the track forming part of the circuit.

Simple Explanation

A Track Circuit is an electrical arrangement used to detect whether a railway vehicle is present on a specified portion of track.

A very important feature is that the rails themselves form part of the electrical circuit.

Example

When a train or vehicle occupies a track-circuited portion, the Track Circuit detects its presence for the associated signalling arrangement.

LDCE Exam Point

Track Circuit = Vehicle Detection + Rails form part of Electrical Circuit

Study Together

Track Circuit ↔ Axle Counter

Both are associated with track occupancy detection, but their principles of operation are different.

58. Train

Official G&SR Definition

“Train” means an engine with or without vehicles attached, or any self-propelled vehicle with or without a trailer, which cannot be readily lifted off the track.

Simple Explanation

Under G&SR, the term Train has a wider meaning than the ordinary idea of a locomotive hauling coaches or wagons.

It may include—

Engine with Vehicles

Engine without Vehicles

or a qualifying Self-Propelled Vehicle with or without Trailer.

An important condition is that such a vehicle cannot be readily lifted off the track.

LDCE Exam Point

Train ≠ Only Engine + Coaches/Wagons

The G&SR definition is broader.

59. Train Examiner

Official G&SR Definition

“Train Examiner” means a Railway Servant duly qualified to examine trains and certify their fitness for safe running and includes any other Railway Servant who may for the time being be performing the duties of a Train Examiner.

Simple Explanation

A Train Examiner is a duly qualified Railway Servant responsible for—

Examining Trains, and

Certifying their fitness for safe running.

The definition also includes another Railway Servant who is duly performing the duties of Train Examiner for the time being.

LDCE Exam Point

Train Examiner = Examination + Certification of Fitness for Safe Running

60. Two-Aspect Signalling

Official G&SR Definition

“Two-aspect signalling” means a signalling arrangement in which each signal displays at any one time either of the two aspects.

Simple Explanation

In a Two-Aspect Signalling System, each signal can display one of two possible aspects at a time.

It should be compared directly with Multiple-Aspect Signalling.

LDCE Exam Point

Two-Aspect Signalling → Two Aspects

Multiple-Aspect Signalling → Three or More Aspects + Pre-warning

Quick Revision – Definitions 41 to 60

No.DefinitionKey Point
41Multiple-Aspect SignallingThree or more aspects + Pre-warning
42NightSunset to Sunrise
43ObstructionObstacle or dangerous condition affecting trains
44Overhead EquipmentElectrical equipment for traction
45Passenger TrainPassengers/coaching traffic; includes Troop Train
46Point & Trap IndicatorsThey are not Signals
47Running LineSignal-governed line + relevant Connections
48Running TrainStarted under Authority to Proceed; journey incomplete
49ShuntingMovement for attaching/detaching/transfer etc.
50Special InstructionsIssued by Authorised Officer
51StationTraffic dealt with/Authority to Proceed given
52Station LimitsPortion under Station Master's control
53Station MasterResponsible for Traffic Working within Station Limits
54Station SectionSpecified section within Station Limits
55Subsidiary RuleSubservient to GR; cannot vary from GR
56System of WorkingSystem adopted for Train Working
57Track CircuitDetects vehicle presence
58TrainEngine/self-propelled vehicle as defined
59Train ExaminerExamines and certifies fitness for safe running
60Two-Aspect SignallingOne of two aspects displayed

Most Important Definitions for Operating LDCE

All definitions should be studied, but the following deserve special attention for Operating Department LDCE:

1. Obstruction — Remember that it includes not only a Train, Vehicle or physical obstacle, but also any condition dangerous to trains.

2. Running Line — Understand that it includes a signal-governed line and relevant Connections used during train movement.

3. Running Train — Connect this definition directly with Authority to Proceed.

4. Shunting — Its scope is wider than merely moving wagons with a locomotive. Pay attention to with or without an Engine and the purpose of movement.

5. Special Instructions — Prepare its difference from Approved Special Instructions.

6. Station — A Station is not defined merely by passenger stoppage. Traffic dealing and Authority to Proceed are important.

7. Station Limits — Remember the relationship with Station Master, Outermost Signals and Special Instructions.

8. Station Master — A very important responsibility-based definition for Operating staff.

9. Station Section — Do not confuse it with Station Limits.

10. Subsidiary Rule — Remember that an SR is subservient to the relevant General Rule and cannot be at variance with a GR.

11. System of Working — One of the foundational concepts of the entire Operating syllabus.

12. Track Circuit — Remember Vehicle Detection + Rails form part of Circuit.

13. Train — The statutory/G&SR meaning is wider than the ordinary meaning of a train.

14. Multiple-Aspect Signalling vs Two-Aspect Signalling — Prepare both definitions comparatively.

Important Comparisons for LDCE

Day vs Night

Day → Sunrise to Sunset

Night → Sunset to Sunrise

Approved Special Instructions vs Special Instructions

Approved Special Instructions → Approved/Prescribed by CRS

Special Instructions → Issued by Authorised Officer

Main Line vs Running Line

Main Line → Line ordinarily used for through running of trains

Running Line → Signal-governed line including relevant Connections used for train movements

Station Limits vs Station Section

Station Limits → Portion of railway under Station Master's control as defined

Station Section → Specified portion within Station Limits according to the applicable signalling arrangement

Axle Counter vs Track Circuit

Both are related to detecting track occupancy, but their working principles are different.

Two-Aspect vs Multiple-Aspect Signalling

Two-Aspect → Two possible aspects

Multiple-Aspect → Three or more aspects with pre-warning by previous signal/signals

G&SR Rule 1.02 – Complete Definition Series

With this Part, our English study of Rule 1.02 is completed as:

Part 1 → Definitions 1–20

Part 2 → Definitions 21–40 + Latest Definition 28A (IR-ATP/Kavach)

Part 3 → Definitions 41–60

A significant current update is Definition 28A – IR-ATP (Kavach), inserted under the Indian Railways (Open Lines) General (Third Amendment) Rules, 2024. Official Railway amendment material confirms that Kavach is an additional aid to the Loco Pilot and does not override the regular train-operation provisions required to be followed.

Therefore, for current Operating LDCE preparation, candidates should not rely solely on an older G&SR edition without checking subsequent amendments.

Conclusion

Definitions under Rule 1.02 form the vocabulary on which much of the Operating Department syllabus is built.

Terms such as Authority to Proceed, Line Clear, Block Section, Last Stop Signal, Interlocking, Isolation, Running Line, Shunting, Station Limits, Station Master and System of Working will repeatedly appear when we move into detailed chapters on Signalling, Block Working, Station Working and Train Working.

For LDCE preparation, the best approach is therefore not merely to memorise definitions, but to understand how these definitions connect with the actual operating rules.

Reference: Indian Railways (Open Lines) General Rules,  Rule 1.02 – Definitions; Indian Railways (Open Lines) General (Third Amendment) Rules, 2024.

Research & Content: G. D. Pandey

No comments:

Post a Comment

Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

.


Labels

TRAFFIC (40) Duties and Responsibility (23) Control Organisation (20) Abnormal Working (19) Accident (17) Working (संचालन) (17) LDCE Special Topic (16) Shunting (12) Systems & Equipment (12) Departmental Exam Special (11) TNC Guide (9) Duty of Operating Staff (7) INDEX (6) Signals (6) Operating Statistics (5) Specification (5) Automatic Section (4) Disaster Management (4) Operating (4) Advance Transportation (3) CAUTION ORDER / SPEED RESTRICTIONS (3) CMS (3) FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS) (3) Lobby system (3) Question Bank (3) Railway (3) 01.035 Duty of Points Man/Shunt Man (2) Accident Drill (2) Automatic Signal (2) Break Binding (2) COA (2) Crank Handle (2) Crew Management System (2) DUTIES OF STATION MASTER IN THE CASE OF ACCIDENTS (2) Data Logger (2) Defective Signals (2) Definition Of Operating Terms (2) Freight Train Operation (2) P Way (2) Question with Answer (2) Safety Device (2) Shunting Restrictions (2) TNC (2) Throughput (2) Train Manager (Guard) (2) fois (2) 001. प्रस्तावना (1) 0010. स्टेशन संचालन नियम की अभिस्वीकृति रजिस्टर (क्र. 1 ) (1) 0011. कर्मचारी वैयक्तिक विवरण रजिस्टर (क्र. 2 ) (1) 0012. कर्मचारी परामर्श रजिस्टर (क्र. 3 ) (1) 0013. निरिक्षण रजिस्टर (क्र. 5 ) (1) 0014. एस एंड टी खराबी रजिस्टर (क्र. 7 ) (1) 0015. सतर्कता आदेश रजिस्टर (क्र. 8) (1) 0016. एस एंड टी खराबी मेमो बुक (क्र. 9 ) (1) 0017. दुर्घटना रजिस्टर (क्र. 11 ) (1) 0018. सतर्कता आदेश मैसेज बुक (क्र. 13) (1) 0019. संरक्षा तथा रजिस्टर (क्र. 14) (1) 002. स्टेशन मास्टर / उप स्टेशन मास्टर की ड्यूटी लिस्ट (1) 0020. डिस्कनेक्शन तथा रिकनेक्शन रजिस्टर (क्र. 15) (1) 0021. आपातकालीन क्रास ऑवर टेस्टिंग रजिस्टर (क्र. 16 ) (1) 0022. रिले रूम चाबी रजिस्टर (क्र. 19 ) (1) 0023. संयुक्त पाइंट एंड क्रासिंग रजिस्टर (क्र. 20) (1) 0024. संयुक्त ट्रैक सर्किट रजिस्टर (क्र. 20 A) (1) 0025. असामान्य संचालन रजिस्टर (क्र. 21 ) (1) 0026. स्टेबल लोड रजिस्टर (क्र. 22 ) (1) 0027. सिक बैगन रजिस्टर (क्र. 26) (1) 0028. क्रेक हैंडल टेस्टिंग रजिस्टर (1) 0029. इंजीनियरिंग एवं पॉवर ब्लाक रजिस्टर (1) 003. व्यक्तिगत परिचय (1) 0030. विभिन्न प्रकार के काउंटर नम्बर रजिस्टर (1) 0031. पैनल ब्लाक होने पर - स्टेशन मास्टर के कर्तव्य (1) 0033. गाड़ी संचालन से संबंधित महत्वपूर्ण अधिकार पत्र (1) 0034. स्टेशन परिचालन रजिस्टर के संरक्षण की सामान्य अवधि (1) 0035. घंटी कोड (1) 0037. दोहरी लाइन पर इकहरी लाइन का संचालन (1) 0038. कार्यभार सौपते समय तथा कार्यभार लेते समय ली जाने वाली सावधानियां (1) 0039. संरक्षा उपस्कर (1) 004. पूनश्र्चर्या पाठ्यक्रम (1) 0041. शंटिंग के दौरान ली जाने वाली सावधानियां (1) 0042. विभिन्न प्रकार के ब्लाक में लि जाने वाली सावधानियां (1) 0046. सिग्नल पार करने (SPAD) पर स्टेशन मास्टर के कर्तव्य (1) 005. आवधिक चिकित्सा परीक्षा (PME) (1) 0051. बोगी कबर्ड बैगनो की जानकारी (1) 0052. कोचिंग स्टॉक का तकनीकी डाटा (1) 0054. LHB कोच की महत्वपूर्ण जानकारियाँ (1) 0056. स्टेशन पर अनिरक्षित किये जाने वाले अन्य रजिस्टर (लेखा विभाग से संबंधित ) (1) 0058. भरे हुए अधिकार पत्र (1) 006. संरक्षा परामर्श फार्म (1) 008. प्रायवेट नंबर शीट (1) 009. स्टेशन संचालन नियम (1) 01.01 History of Rail Transport in India (1) 01.02.Functions of the Traffic Department (1) 01.03. Hierarchical set up and line of control of Operating Department (1) 01.032 Duty of Deputy Station Manager (Outdoor)(Outdoor) (1) 01.034 Duty of Panel SM (1) 01.036 Duty of Gate Man (1) 01.037 Normal Period Of Preserved - Station Operating Registers and Records (1) 01.05. Basic Function of control (1) 01.06. Duties of Control Staff (1) 01.07. Books / documents and basic records to be kept in control office (1) 01.10. Registers generally maintained in control (1) 01.11. Items checked by Sr. DOM daily/ regular intervals periodically & monthly (1) 02.01 ट्रेन कंट्रोल एव गाड़िया संचालन में कंट्रोल के जिम्मदारी (1) 02.02 ट्रैफिक कंट्रोल (1) 02.02. Emergency Rescue Operation / Disaster Management (1) 02.03. PREFERENTIAL TRAFFIC ORDER (1) 02.03.पॉवर कंट्रोल (1) 02.04 वैगनो & इंजन की उपयोगिता (ENGINE UTILIZATION) (1) 02.04. Importance of Freight Operation: (1) 02.05. TRANSPORT PRODUCTS (1) 02.06. FREIGHT INCENTIVE SCHEMES (1) 02.07. Rationalization Order (1) 02.08. Development of rail-side warehouses (1) 02.09.. Wagon Pool (1) 03 - मास्टर चार्ट (MASTER CHART) (1) 03.01. LOCO LINKS AND POWER PLAN CREW LINKS (1) 03.02. 10-Hour Rule for Train Crew (1) 03.03. LOCO MAINTENANCE SCHEDULE (1) 03.05. G D R ( GUARD DRIVER REPORT ) (1) 03.06. NOMINATED INTENSIVE EXAMINATION POINTS ON CENTRAL RAILWAY (1) 03.07. WORKING OF CLAMPED WAGON (1) 03.08. ODC (1) 03.10.1 DETAILS OF BRAKE POWER CERTIFICATE (1) 04 - सुबह की पोजीशन (MORNING POSITION) (1) 04.01. Section Capacity and Throughput (1) 04.08. ROLL ON - ROLL OFF (1) 05 - बगाडी संचालन पर प्रभाव डालने वाले कारक (FATO) (1) 05.01. Systems of Working (1) 05.03. All Communication Failure on Double line (1) 05.04. All Communication Failure on Single line (1) 05.05. TSL working on Double line (1) 05.06. Abnormal Working in Automatic Section (1) 06 - 01.उपनगरीय नियंत्रण (SUBURBAN CONTROL) (1) 06 - 02.एरिया कंट्रोल (1) 06 - 04.सेंट्रल कंट्रोल (1) 06 - 05.Emergency control (1) 06- 03.ट्रेन मैनेजमेंट सिस्टम (TRAIN MANAGEMENT SYSTEM) (1) 06.01. LOCO LINK (1) 06.02. RAKE LINK (1) 06.04. MARSHALLING OF TRAIN (1) 07 - नियंत्रण कार्यालय में विभाग नियंत्रकों के कर्त्तव्य (DUTIES) (1) 07.01. TIME TABLES – INTRODUCTION (1) 07.02. Punctuality (1) 07.03. COACHING VEHICLE CENSUS (1) 07.04. Rules for booking Special Coaches & Special Trains on FTR (1) 07.05. Coaching codes (1) 07.06. ACCIDENT AND SAFETY ORGANISATION (1) 08 - विभिन्न परिस्थियों में खण्ड नियंत्रक (SCOR) द्वारा किये जाने वाले कार्य (1) 09 - सवारी गाडी के कोड (IRCA Rule Book - IV) (1) 10 - संखियकी (STATISTICS) (1) 12 - 01.विशेष प्रकार के माल स्टॉक की मार्शलिंग (1) 12 - 02.माल गाडी का ब्लाक रेक / Standard rake size for Train load (1) 12 - 03.ओ डि सि (ODC) संचालन (1) 12 - यात्री और माल गाडी का ब्लाक रेक (1) 13 - 01.डीविज़न वैगन बैलेंस / (DIVISONAL WAGON BALANCE) (1) 14 - SECTION CAPACITY) (1) 15 - 01.मालगाड़ी को आदेशित करना (ट्रेन ओर्ड़ेरिंग / TRAIN ORDERING ) (1) 15 - 02.माल गाडी की औसात गति (1) 15 - 03.वैगनो का यानात्रण (Transhipment of Goods) (1) 15 - 07.गाड़ीयो का प्रस्थान पूर्व विलंब (PDD) (1) 15 - मालगाड़ी संचालन (Goods Train Operation) एवं लोड टेबल (1) 15 -06.कन्टेनराईजेशन Container (CONCOR) (1) 16 - 02.समय सारणी (TIME TABLE) (1) 16 - 03.रेक लिंक / (RAKE LINK) (1) 16 - 04.प्लेटफार्म ऑक्यूपेशन चार्ट / (Platform Occupation Chart) (1) 16 - 05.पिट लाइन ऑक्यूपेशन चार्ट (Pit Line Occupation Chart) (1) 16 - 06.विषेश/वी आई पी गाड़ीयो का संचालन (Movement of Special/VIP Trains) (1) 16 - 07.मेला एवं मिलिटरी स्पेशल गाड़ियों का संचालन एवं सावधानियाँ (1) 16 - यात्री गाडी संचालन / Passenger Train Operation (1) 17 - स्टॉक रिपोर्ट / Stock Report (1) 18 - 01.क्रू लिंक (CREW LINK) / लोको लिंक (LOCO LINK) (1) 18 - 02.दस घंटे नियम (10 HOURS RULE) (1) 18 - लॉबी कार्य पध्दति / LOBBY WORKING (1) 19 - 01.इंजन योजना (POWER PLAN) (1) 19 - 02.इंजन की उपयोगीता (ENGINE UTILISATION) (1) 19 - 03.विशिष्ठ उर्जा खपत / SPECIFIC FUEL CONSUMPTION (SPC) (1) 19 - विभिन प्रकार के इंजन और उनक हार्स पॉवर तथा गती (1) 2.1 Various Machines for Track Maintenance (1) 20 - 01. रेशनलाइजेशन स्कीम : / Rationalization Scheme (1) 20 - 02.रोक (BAN) & प्रतिबंध (RESTRICTION) (1) 20 - 03.वैगन पंजीकरण (1) 20 - 04.वैगन उपयोगीता चक्र (WTR) (1) 20 - 05.वेगन सेन्सस / WAGON CENSUS (1) 20 - वैगन उपयोगीता / अधिमान्य यातायात आदेश :(PTO/PTS) (1) 21 - 01.विधुतिकृत सेक्शन में गाड़िया का संचालन (1) 21 - 02.ट्रैफिक वोर्किंग रूल्स (TWR) (1) 21 - 03.टावर वैगन का संचालन (1) 21 - समपार (लेवल क्रासिंग ) (1) 22 - 01.सिगनल को खतरे की स्तिथि में पर करना (SPAD) (1) 22 - 03.दुर्घटना होने पर खंण्ड नियंत्रक के कर्त्तव्य (AM - ३१९) (1) 22 - 04.दुर्घटना स्थल के प्रभारी अधिकारी के कर्तव्य (AM - 324) (1) 22 - 05.मंडल नियंत्रण कार्यालय के प्रभारी अधिकारी के कर्तव्य - (AM - 323) (1) 22 - 06.दुर्घटना होने पर स्टेशन मास्टर की ड्यूटी (ऍम 311) (1) 22 - 07.रहत व्यवस्थाओ की ओर्ड़ेरिंग देना (AM - 405) (1) 22 - 11.नॉन - इंटरलॉकिंग संचालन (Non - Interlocked Working) (1) 22.10 सुरक्षा डेविसस (Safety Devices) - ACD EOIT GSMR TAWD VCD WILD (1) 23 - कंट्रोल ओफ्फिक निर्देश (1) 24 - COA Main Menu (1) 25 - अग्रीम प्लाटिंग (चार्टिंग) / Advance Plotting (1) 26 - 01.नियंत्रण कार्यालय अनुप्रयोग हेतु त्वरित दिशा निर्दश (1) 26 - COA एवं FOIS के एकीकरण (Integration) हेतु अवय्शक निर्दाश (1) 27 - पश्चिम मध्य रेल तथा मध्य रेल के सहायक नियमो में विभिन्नता की सूची (1) 28 - निरीक्षण उसके उदेश्य और प्रकार (Inspection Its Objects & Type) (1) 28.01 Schedule Of Inspection By Operating / Safety Officers And Transportation Inspectors (1) 3.031 DIESEL LOCO SCHEDULE & DURATION (1) 3.09 ELECTRIC LOCOMOTIVE FEATURES (1) A.01 भारतीय रेल का इतिहास एवं प्रगति (1) A.02. भारतीय रेल का संगठनात्मक ढांचा (1) A.03.परिचालन विभाग का सेटअप (1) A.04. महत्वपूर्ण विभागों के सामान्य कार्य (1) A.05 सामान्य एवं सहायक नियम ब्लाक संचालन नियमावली दुर्घटना नियमावली (1) A.06.परिचालन नियमावली/ संचालन समय सारिणी (1) A.07.स्टेशन संचालन नियम (1) A.08.रेल सेवको पर साधारण लागू होने वाले नियम (1) A.09.महत्वपूर्ण परिभाषाए (1) A.10.सिगनलों का सामान्य परिचय (1) A.11.पटाखा सिगनल (1) A.12.हाथ सिगनल (1) A.13.गाड़ी संचालन पध्दतियाँ (1) A.15.वाहनों को सुरक्षित करना (1) A.17.हॉट एक्सल/फ़्लैट टायर/ओपेन डोर एवं हैंकिंग पार्ट (1) A.19.स्टेशनों/यार्ड में रखे जाने वाले रजिस्टर (1) A.20.गाड़ी परिचालन में ट्रेन्स क्लर्क की भूमिका (1) A.21.गाड़ी संचालन से समबंधित महत्वपूर्ण नियम (1) A.22.कंट्रोल संगठन के कार्य (1) A.23.स्टेशन/यार्ड/कंट्रोल आफिस के क्रिया कलाप (1) A.24.विभिन्न प्रकार के कोचिंग एवं गुड्स स्टॉक (1) A.25.ब्रेक पावर प्रमाण पत्र (1) A.26.इंजन एवं ब्रेकयान में एयर प्रेशर की मात्रा (1) A.27.कंटीन्युटी टेस्ट (1) A.28.बड़े आयाम के प्रेषण (1) A.29.सेंसस एवं स्टॉक रिपोर्ट (1) A.30.मालगाड़ी संचालन/ गाडियों को आर्डर करना (1) A.31.डिविजन वैगन संतुलन (1) A.32.इन्टरचेंज (1) A.35.वैगन पूल (1) A.36.वैगन उपयोगिता चक्र (1) A.37.परिचालन सांख्यिकी / परिचालन अनुपात (1) A.38.मोर्निंग पोजीशन फैटो (1) A.39.कोचिंग एवं गुड्स गाडियों की मार्शलिंग/घाट मार्शलिंग/रेक मार्शलिंग (1) A.41.जीडीआर चेक/ सेफ टू रन सर्टिफिकेट/ ओवर लोडिंग /अनइव्ह्न लोडिंग (1) A.42.लोड टेबल /एक्सल लोड / बैकिंग इंजन की आवश्यकता (1) A.43.माल गाडियों के विभिन्न प्रकार के ब्रेक पावर प्रमाणपत्र उनकी वैधता (1) A.44.स्थान शुल्क एवं विलंब शुल्क स्केटिंग (1) A.46.लोको आउटेज एवं इंजन उपयोगिता (1) ACD (1) ACF (1) ART - Accident Relief Train (1) AUTHORITIES USING IN TRAIN WORKING (1) AWS (1) Accident Inquiry (1) B.02.एफओआईएस/आर एस एम /टीएमएस /सीओआईएस/आईसीएमएस/पीएएम (1) B.05.यूटीएस/ पीआरएस UTS/PRS (1) B.06.ट्रेन मेनेजमेंट सिस्टम (1) B.07.एसीडी / टीसीएएस (1) BOOKED SPEED (1) Block working (1) CONCOR (1) Control of Shunting (1) Correction Slip (1) DFCCIL (1) Department (1) Duties of TNC (1) Duty (1) Duty List (1) Duty of Block Station Master / Manager (1) Duty of Station Master / Manager (1) Flat Tyre (1) Fly Shunting (1) G.01 Code for LHB Coaching Stock (1) G.01 रेल सेवकों पर साधारणतया लागू होने वाले नियम (1) G.02 G & SR - परिभाषाएं (1) G.02 स्टेशन पर अग्निसमन उपकरण (1) G.03 इन्टरलाॅकिंग एवं नाॅन-इन्टरलाॅकिंग. (1) G.04 पाॅइन्ट एवं सिगनल (1) G.05 विभिन्न प्रकार की लाइटें एवं रिपीटर (1) G.06 संचालन मे आनेवाले विभिन्न प्रकार के बोर्डं (1) G.07 इंजीनियरिंग सिगनल एवं कार्यस्थल का बचाव (1) G.08 सिगनल तथा पाॅइन्ट की खराबी (1) G.10 कार्य संचालन पद्धति (1) G.11केवल एक गाड़ी पद्धति (1) G.12 सम्पूर्ण ब्लाॅक पद्धति (1) G.13 गाड़ियों का संचालन (1) G.14 स्टेशनों पर बजाई जाने वाली घंटीया (1) G.15 आटोमेटिक ब्लाॅक पद्धति (1) G.16 अनुगामी गाड़ी पद्धति (1) G.17 सतर्कता आदेश (1) G.18 अवरुद्ध लाइन (1) G.19 शन्टिंग (1) G.21 मार्शलिंग एवं डेड इंजन का संचालन (1) G.21 गाड़ी को स्टेशन से रवाना करना (1) G.23 समयपालन (1) G.24 लोको पायलट व गार्ड के निजी उपकरण (1) G.25 गार्ड व लोको पायलट से संबंधित रजिस्टर व प्रपत्र (1) G.26 रनिंग लाइन पर लोड को स्टेबल व क्लीयर करना (1) G.28 लोको पायलट व गार्ड की ड्यूटी (1) G.29 विभिन परिस्थितियों में लोको पायलट की ड्यूटी (1) G.30 मेटेरियल ट्रेन का संचालन (1) G.31 विभिन्न परिस्थितियों मे स्टेशन मास्टर की ड्यूटी (1) G.32 गाड़ियों की गति (1) G.33 कैच एवं स्लिप साइडिंग (1) G.33 स्टेशनों पर विभिन्न उपकरण (1) G.34 लाॅक एवं ब्लाॅक उपकरण (1) G.35 असामान्य परिस्थितियों में गाड़ियों का संचालन (1) G.36 इंजन सीटी कोड (1) G.37 ई एम यू / एम ई एम यू / डी एम यू में संके तहेतु बेल कोड (1) G.37 नए परिचालन फाॅर्म (1) G.38 इंजीनियरिंग कार्य प्रणाली व इंजीनियरिंग वाहनों का संचाल (1) G.38 पावर ब्लाॅक (1) G.40 गाड़ी लिपिक के रजिस्टर व कार्यप्रणाली (1) Golden Hour (1) Group "B" (1) Guide (1) HKT (1) Hand Shunting (1) Hot Axle (1) Hotter Code (1) Hump Shunting (1) ICMS (1) IRCON (1) IRCTC (1) KNOW ABOUT - जन शिकायत पुस्तिका (1) KRCL (1) LED Torch (1) Loco Pilot Duty (1) Loose Shunting (1) MPS (1) MRV-Medical Relief Van (1) Major causes of accidents (1) Medical Care (1) Mock Drill (1) Monsoon Patrolling (1) NDMA (1) NTES (1) Operating Ratio (1) Pad Lock (1) Private Number (1) Push and Pull Shunting (1) Python Rake (1) Question Bank & Papers With Answer For Group "B" / Guard / Station Master etc Exam (1) RITES (1) RVNL (1) RailTel (1) Responsibility of Station Master (supervisory) (1) Rule. Manual (1) S 01.0 Significance Of Rule Books (1) S 01.01 Differences Between General And Subsidiary Rules (1) S 02.00 Rules And Instructions (1) S 03.00 Rules Applying To The Railway Servant Generally (1) S 05.00 Classification Of Station (1) S 07.00 DETONATING SIGNAL (1) S 08.00 Hand Signal (1) S 09.00 Traffic Board And Engineering Indicators (1) S 11.00 CONDITIONS FOR TAKING OFF SIGNALS (1) S 12.00 CONDITIONS FOR CLEARING THE SECTION AND PRECAUTIONS (1) S 13.00 AUTHORITIES USING IN TRAIN WORKING (1) S 14.00 INTERLOCKING AND ISOLATION (1) S 15.00 POINTS (1) S 16.00 WORKING OF TRAINS DURING OVERHAULING (1) S 17.00 DEFECTIVE POINTS (1) S 20.00 Reception Dispatch And Crossing Of Train At Station (1) S 22.00 PUSHING BACK OF TRAIN (1) S 23.00 SECURING VEHICLES AT STATION (1) S 24.00 VEHICLES ESCAPING FROM STATION (1) S 25.00 WORKING OF MATERIAL TRAIN (1) S 25.01 Procedure of sending material train into the Block Section (1) S 25.02 STABLING OF MATERIAL TRAIN (1) S 26.00 HOT AXLE AND FLAT TYRE (1) S 27.00 WORKING OF TRAIN WITHOUT BRAKE VAN (1) S 28.00 STANDARD TIME (1) S 29.00 SPEED CHART (1) S 30.00 ELECTRIC BLOCK INSTRUMENT (1) S 31.00 TAIL LAMP AND TAIL BOARD (1) S 36.00 TRAIN PARTING (1) S 37.00 TRAIN DIVIDING (1) S 38.00 SEND ASSISTING ENGINE INTO OBSTRUCTED BLOCK SECTION (1) S 42.00 YARD (1) S 43.00 DUTIES OF STATION STAFF TOWARDS CONTROL (1) S 44.00 WAGON EXCHANGE REGISTER (1) S 45.00 STOCK REPORT (1) S 46.00 WORKING OF TRAIN IN GHAT SECTION / CATCH AND SLIP SIDING (1) S 47.00 MEANS OF COMMUNICATION AND WHISTLE CODE (1) S 48.00 ACTION TAKEN DURING THE ACP (1) S 49.00 WORKING OF TRAIN DURING STORM / ANEMOMETER CYCLONE (1) S 50.00 FIRE IN TRAIN (1) S 51.00 INFORMATION SYSTEM / COA/ FOIS/ ICMS/ PRS etc (1) S 53.00 LOCOMOTIVE LIGHT (1) S 54.00 WORKING OF TRAIN IN ELECTRIFIED SECTION AND TOWER WAGON (1) S 55.00 LEVEL CROSSING GATE (1) S 56.00 OVER DIMENSIONAL CONSIGNMENT (O.D.C. ) (1) S 57.00 MARSHALLING (1) S 61.00 DEFECTIVE PARMANENT WAY (1) S 62.00 WORKING OF LONG HAUL TRAINS (PYTHON) ON CENTRAL RAILWAY (1) S 63.00 HEAVY HAUL TRAINS (1) S 64.00 ABBREVIATION (1) S 65.00 DIFFERENCE BETWEEN SUBSIDIARY RULES OF CR AND WCR (1) SERIOUS ACCIDENT (ऍम 105) (1) SH (1) SPEED ON TURNOUTS (1) Safety Chain (1) Scotch Block (1) Section Capacity (1) Shunting Order (1) Skid (1) Station Earning (1) Station Inspection (1) Station Manager (1) TYPES OF TRACK MACHINE (1) Train Delayed in Block Section (1) VTO (1) Vehicle Guidance (1) Video (1) WAGON CENSUS ON BROAD GAUGE (1) WORKING OF TRACK MACHINE (TTM etc.) (1) WORKING OF TROLLY/LORRY (1) Yard Congestion (1) long Haul (1) अग्रदाय राशि (Imprest Cash) (1) काॅमन स्टार्टर पर गाड़ी का संचालन (1) परिचालन सूचना प्रणाली (1) पाइथाॅन रैक का संचालन (1) बिना सिगनल वाली लाइन (1) योजना बनाने में स्टेशन मास्टर की भूमिका (1) सार्वजानिक क्षेत्र के उपक्रम और अन्य संगठन (PSUs) (1) सिगनल खराब होने पर गाड़ियों का संचालन (1) सिगनलों का आदान प्रदान (1) स्टेशन मास्टर अवश्य ध्यान दे (1)