Which INFORMATION do you want? Search Below ↓

JOINT SAFETY CIRCULAR - BRAKE BINDING AND PREVENTION OF FLAT TYRE ON PASSENGER CARRYING & GOODS TRAINS

 

JOINT SAFETY CIRCULAR ON ACTION TO BE TAKEN ON BRAKE BINDING AND PREVENTION OF FLAT TYRE ON PASSENGER CARRYING & GOODS TRAINS

(Ref – Safety Circular No. 25/2000 dated 28.11.2000 jointly signed by –CME, CE, CEE, COM & CSO)-
The brake binding and subsequently flat tyre resulting in safety hazard on account of Rail Fracture/Weld failure/Roller bearing failure etc.

1.     Detection of Brake Binding/Flat Tyres on Trains-

Train crew/Station staff/Gatemen will be vigilant to detect any abnormality such as brake binding, unusal sound, smoke emission etc. If any such abnormality is noticed, the above staff shall take immediate steps to stop the affected train.

2. In case of brake binding on a train enroute, the Driver and Guard must take the prescribed remedial action or releasing the brakes and isolate the brakes of the affected coach/wagon, which should be got examined at the next train examination point. This will ensure that, brake binding will not result in flat tyre.

3. TXR staff available for Rolling In/Rolling Out examination shall detect brake binding/flat tyre in coaches and initiate action.

4. It is imperative that, all cases of coach detachment on the Division be duly enquired into by Officers concerned with Loco Operation, C & W and Safety and remedial measures taken to prevent enroute detachments.

5. Action to be taken by Train Crew after detection of Brake Binding/Flat Tyrei)
i. For air brake coaching stock – Assistant Driver and Guard will find out location of brake binding/flat tyre. At station the assistance should be given by Station staff to train crew. After detecting the culprit coach, the brakes should be released manually and thereafter, brake system should be isolated by closing isolating cocks of brake cylinders, isolating cocks in between FP and auxiliary Reservoir and isolating the DV by rotating DV handle to horizontal position as per detailed instructions given in the working time table.

ii) For vacuum brake stock-  Assistant Driver and Guard will find out location of brake binding/flat tyre. At station, the assistance should be given by Station staff to train crew. After detecting, the brake should be manually released and thereafter, the brake system should be isolated by disconnecting siphon pipe from release valve and providing wooden plug as dummy with hard grease on the loose end of siphon pipe. For this, the dummy plug/hard grease will be supplied to driver and guard as personal store, by the lobby incharges for guards and drivers at the time of sign on. The supply of the wooden plug/hard grease would be taken from C & W department.

iii) For Superfast trains or other trains on which TXR staff is accompanying, the Driver and Guard will be assisted by the on board TXR staff for activities mentioned in 5(i) & (ii).

6. If as a result of isolation of brake system as per para 5 (i) & (ii) above, the brake power enroute comes down below prescribed 90%, the train should be worked with restricted speed to the next train examination station.

7. Action to be taken by C&W staff
i) The train on which brake binding/flat tyre is reported should be examined by C&W staff at the first opportunity, investigated and certified FIT for further run.
ii) CWI/TXR staff should accompany the train whenever flat tyres are reported. They must ensure proper repair either at the enroute station or at the terminating station as deemed necessary.

8. Action to be taken by Train Crew at the time of Cattle run over
       i)  After cattle run over, if BP pressure/vacuum drops suddenly, train crew will check the train for the reason of BP pressure/vacuum drop. If any BP/FP/VAC hose pipe is found uncoupled train crew will couple it and ensure release of train brakes. The train crew will manually release the brakes, if there is brake binding. If manual release is not possible, the particular coach will be isolated as mentioned in par 6 (i) & (ii) above.

ii) Guard of the train will give necessary message to Section Controller regarding the affected coach at the next station, who will give details of the coach to C&W Controller.
TXR staff at the first available examination point will check the affected coach for proper functioning of brake equipment.

9. Action to be taken by Train Crew at the time of ACP
i) The train crew will check the train to find out the coach from which alarm chain has been pulled. After detecting the coach, resetting of ACP apparatus should be done.

ii) It should be ensured that there is no leakage after resetting the ACP.

iii) It should also be ensured that, the brakes of the affected coach are in released condition after resetting the ACP.

iv) If brakes are not released after resetting the ACP, then action should be taken as detailed at 6(i) & (ii) above.

10. Action to be taken by Train Crew after Emergency Brake Application-

Before starting the train it should be ensured that, prescribed amount of air pressure/vacuum has been obtained in engine and brakes are in fully released position.

(Ref – Safety Circular No. 25/2000 dated 28.11.2000 jointly signed by –CME, CE, CEE, COM & CSO)-
The brake binding and subsequently flat tyre resulting in safety hazard on account of Rail Fracture/Weld failure/Roller bearing failure etc.

1.     Detection of Brake Binding/Flat Tyres on Trains-

Train crew/Station staff/Gatemen will be vigilant to detect any abnormality such as brake binding, unusal sound, smoke emission etc. If any such abnormality is noticed, the above staff shall take immediate steps to stop the affected train.

2. In case of brake binding on a train enroute, the Driver and Guard must take the prescribed remedial action or releasing the brakes and isolate the brakes of the affected coach/wagon, which should be got examined at the next train examination point. This will ensure that, brake binding will not result in flat tyre.

3. TXR staff available for Rolling In/Rolling Out examination shall detect brake binding/flat tyre in coaches and initiate action.

4. It is imperative that, all cases of coach detachment on the Division be duly enquired into by Officers concerned with Loco Operation, C & W and Safety and remedial measures taken to prevent enroute detachments.

5. Action to be taken by Train Crew after detection of Brake Binding/Flat Tyrei)
i. For air brake coaching stock – Assistant Driver and Guard will find out location of brake binding/flat tyre. At station the assistance should be given by Station staff to train crew. After detecting the culprit coach, the brakes should be released manually and thereafter, brake system should be isolated by closing isolating cocks of brake cylinders, isolating cocks in between FP and auxiliary Reservoir and isolating the DV by rotating DV handle to horizontal position as per detailed instructions given in the working time table.

ii) For vacuum brake stock-  Assistant Driver and Guard will find out location of brake binding/flat tyre. At station, the assistance should be given by Station staff to train crew. After detecting, the brake should be manually released and thereafter, the brake system should be isolated by disconnecting siphon pipe from release valve and providing wooden plug as dummy with hard grease on the loose end of siphon pipe. For this, the dummy plug/hard grease will be supplied to driver and guard as personal store, by the lobby incharges for guards and drivers at the time of sign on. The supply of the wooden plug/hard grease would be taken from C & W department.

iii) For Superfast trains or other trains on which TXR staff is accompanying, the Driver and Guard will be assisted by the on board TXR staff for activities mentioned in 5(i) & (ii).

6. If as a result of isolation of brake system as per para 5 (i) & (ii) above, the brake power enroute comes down below prescribed 90%, the train should be worked with restricted speed to the next train examination station.

7. Action to be taken by C&W staff
i) The train on which brake binding/flat tyre is reported should be examined by C&W staff at the first opportunity, investigated and certified FIT for further run.
ii) CWI/TXR staff should accompany the train whenever flat tyres are reported. They must ensure proper repair either at the enroute station or at the terminating station as deemed necessary.

8. Action to be taken by Train Crew at the time of Cattle run over
       i)  After cattle run over, if BP pressure/vacuum drops suddenly, train crew will check the train for the reason of BP pressure/vacuum drop. If any BP/FP/VAC hose pipe is found uncoupled train crew will couple it and ensure release of train brakes. The train crew will manually release the brakes, if there is brake binding. If manual release is not possible, the particular coach will be isolated as mentioned in par 6 (i) & (ii) above.

ii) Guard of the train will give necessary message to Section Controller regarding the affected coach at the next station, who will give details of the coach to C&W Controller.
TXR staff at the first available examination point will check the affected coach for proper functioning of brake equipment.

9. Action to be taken by Train Crew at the time of ACP
i) The train crew will check the train to find out the coach from which alarm chain has been pulled. After detecting the coach, resetting of ACP apparatus should be done.

ii) It should be ensured that there is no leakage after resetting the ACP.

iii) It should also be ensured that, the brakes of the affected coach are in released condition after resetting the ACP.

iv) If brakes are not released after resetting the ACP, then action should be taken as detailed at 6(i) & (ii) above.

10. Action to be taken by Train Crew after Emergency Brake Application-

Before starting the train it should be ensured that, prescribed amount of air pressure/vacuum has been obtained in engine and brakes are in fully released position.


यात्री परिवहन और माल गाड़ियों में ब्रेक बाइंडिंग और फ्लैट टायर की रोकथाम पर की जाने वाली कार्रवाई पर संयुक्त सुरक्षा परिपत्र

(संदर्भ - सुरक्षा परिपत्र संख्या 25/2000 दिनांक 28.11.2000 -सीएमई, सीई, सीईई, सीओएम और सीएसओ द्वारा संयुक्त रूप से हस्ताक्षरित) -

ब्रेक बाइंडिंग और उसके बाद फ्लैट टायर के परिणामस्वरूप रेल फ्रैक्चर/वेल्ड विफलता/रोलर बेयरिंग विफलता आदि के कारण सुरक्षा खतरा पैदा हो गया।

1.      ट्रेनों में ब्रेक बाइंडिंग/फ्लैट टायरों का पता लगाना-

ट्रेन चालक दल/स्टेशन कर्मचारी/गेटमैन किसी भी असामान्यता जैसे ब्रेक बाइंडिंग, असामान्य ध्वनि, धुआं उत्सर्जन आदि का पता लगाने के लिए सतर्क रहेंगे। यदि ऐसी कोई असामान्यता देखी जाती है, तो उपरोक्त कर्मचारी प्रभावित ट्रेन को रोकने के लिए तत्काल कदम उठाएंगे।

2. रास्ते में ट्रेन में ब्रेक बाइंडिंग के मामले में, ड्राइवर और गार्ड को निर्धारित preventive कार्रवाई करनी चाहिए या ब्रेक जारी करना चाहिए और प्रभावित कोच/वैगन के ब्रेक को अलग करना चाहिए, जिसकी जांच अगले ट्रेन परीक्षा बिंदु पर की जानी चाहिए। इससे यह सुनिश्चित होगा कि, ब्रेक बाइंडिंग के परिणामस्वरूप फ्लेट टायर नहीं होगा।

3. रोलिंग इन/रोलिंग आउट जांच के लिए उपलब्ध टीएक्सआर स्टाफ कोचों में ब्रेक बाइंडिंग/फ्लैट टायर का पता लगाएगा और कार्रवाई शुरू करेगा।

4.  मंडल पर कोच डिटेचमेंट के सभी मामलों में यह जरूरी है कि  लोको ऑपरेशन, सी एंड डब्ल्यू और सुरक्षा से संबंधित अधिकारियों द्वारा विधिवत जांच की जाए और रास्ते में डिटेचमेंट को रोकने के लिए preventive उपाय किए जाना चाहिए।

5. ब्रेक बाइंडिंग/फ्लैट टायर का पता चलने के बाद ट्रेन क्रू द्वारा की जाने वाली कार्रवाई

i) एयर ब्रेक कोचिंग स्टॉक के लिए -  सहायक चालक और गार्ड ब्रेक बाइंडिंग/फ्लैट टायर का स्थान पता लगाएंगे। स्टेशन पर क्रू को सहायता करने के लिए स्टेशन स्टाफ द्वारा सहायता दी जानी चाहिए। दोषी कोच का पता लगाने के बाद, ब्रेक को मैन्युअल रूप से रिलीज किया जाना चाहिए और उसके बाद, ब्रेक सिलेंडर के अलग-अलग कॉक्स को बंद करके ब्रेक सिस्टम को अलग किया जाना चाहिए। वोर्किंग टाइम टेबल में दिए गए निर्देश के अनुसार एफपी और auxiliary Reservoir के बीच कॉक्स को अलग करना चाहिए और विस्तृत विवरण के अनुसार डीवी हैंडल को क्षैतिज स्थिति में घुमाकर डीवी को अलग करना चाहिए।

ii) वैक्यूम ब्रेक स्टॉक के लिए-  सहायक चालक और गार्ड ब्रेक बाइंडिंग/फ्लैट टायर का स्थान पता लगाएंगे। स्टेशन पर, क्रू को सहायता करने के लिए स्टेशन स्टाफ द्वारा सहयोग दी जानी चाहिए। ब्रेक बाइंडिंग पता लगाने के बाद, ब्रेक को मैन्युअल रूप से रिलीज किया जाना चाहिए और उसके बाद, रिलीज वाल्व से साइफन पाइप को डिस्कनेक्ट करके और साइफन पाइप के ढीले सिरे पर कठोर ग्रीस के साथ लकड़ी के प्लग को डमी के रूप में प्रदान करके ब्रेक सिस्टम को अलग किया जाना चाहिए। इसके लिए, डमी प्लग/हार्ड ग्रीस को साइन ऑन के समय गार्ड और ड्राइवरों के लिए लॉबी प्रभारी द्वारा लकड़ी के प्लग/हार्ड ग्रीस की आपूर्ति सी एवं डब्ल्यू विभाग से ली जाएगी और व्यक्तिगत स्टोर के रूप में ड्राइवर और गार्ड को आपूर्ति की जाएगी।

iii) सुपरफास्ट ट्रेनों या अन्य ट्रेनों के लिए जिनमें टीएक्सआर स्टाफ साथ में रहते है, ड्राइवर और गार्ड को i और ii में उल्लिखित गतिविधियों के लिए ऑन बोर्ड टीएक्सआर स्टाफ द्वारा सहायता प्रदान की जाएगी।

6. यदि ऊपर पैरा i और ii के अनुसार ब्रेक सिस्टम को अलग करने के परिणामस्वरूप, रास्ते में ब्रेक पावर निर्धारित 90% से कम हो जाती है, तो ट्रेन को अगले ट्रेन परीक्षण स्टेशन तक प्रतिबंधित गति के साथ चलाया जाना चाहिए।

7. सी एंड डब्ल्यू स्टाफ द्वारा की जाने वाली कार्रवाई

i) जिस ट्रेन में ब्रेक बाइंडिंग/फ्लैट टायर की सूचना मिलती है, उसकी सी एंड डब्ल्यू स्टाफ द्वारा पहले अवसर पर जांच की जानी चाहिए, और जांच के बाद आगे चलाने के लिए फिट प्रमाणित किया जाना चाहिए।
ii) जब भी फ्लेट टायर की सूचना मिले तो सीडब्ल्यूआई/टीएक्सआर स्टाफ को ट्रेन के साथ जाना चाहिए। उन्हें आवश्यक समझे जाने वाले मार्ग के स्टेशन पर या समापन स्टेशन पर उचित मरम्मत सुनिश्चित करनी होगी।

8. मवेशियों के  run over जाने के समय ट्रेन क्रू द्वारा की जाने वाली कार्रवाई

     i)   मवेशियों के  run over के बाद, यदि बीपी प्रेशर/वैक्यूम अचानक गिर जाता है, तो ट्रेन क्रू बीपी प्रेशर/ वैक्यूम ड्रॉप के कारण के लिए ट्रेन की जांच करेगा। यदि कोई बीपी/एफपी/वीएसी होज़ पाइप बिना जुड़ा हुआ पाया जाता है तो ट्रेन चालक दल इसे जोड़ेगा और ट्रेन के ब्रेक जारी करना सुनिश्चित करेगा। यदि ब्रेक बाइंडिंग है तो ट्रेन चालक दल मैन्युअल रूप से ब्रेक रिलीज करेगा। यदि ऊपर पैरा 5 (i) और (ii) में उल्लिखित अनुसार मैन्युअल रिलीज़ संभव नहीं है, तो  उस विशेष कोच को अलग कर दिया जाएगा।

ii) ट्रेन का गार्ड अगले स्टेशन पर प्रभावित कोच के संबंध में सेक्शन कंट्रोलर को आवश्यक संदेश देगा, जो सीएंडडब्ल्यू कंट्रोलर को कोच का विवरण देगा।
पहले उपलब्ध परीक्षा बिंदु पर टीएक्सआर कर्मचारी, ब्रेक उपकरण के उचित कार्यवाही के लिए प्रभावित कोच की जांच करेंगे।

9. ए सी पी के समय ट्रेन क्रू द्वारा की जाने वाली कार्रवाई

i) ट्रेन क्रू उस कोच का पता लगाने के लिए ट्रेन की जांच करेगा जिससे अलार्म चेन खींची गई है। कोच का पता लगाने के बाद ए सी पी उपकरण की रीसेटिंग की जानी चाहिए।

ii) यह सुनिश्चित किया जाना चाहिए कि ए सी पी को रीसेट करने के बाद कोई लीकेज न हो।

iii) यह भी सुनिश्चित किया जाना चाहिए कि, ए सी पी को रीसेट करने के बाद प्रभावित कोच के ब्रेक रिलीज़ स्थिति में हैं।

iv) यदि ए सी पी को रीसेट करने के बाद ब्रेक रिलीज नहीं होते हैं, तो ऊपर 5(i) और (ii) में दिए गए विवरण के अनुसार कार्रवाई की जानी चाहिए।

10. आपातकालीन ब्रेक लगाने के बाद ट्रेन क्रू द्वारा की जाने वाली कार्रवाई-

ट्रेन शुरू करने से पहले यह सुनिश्चित कर लेना चाहिए कि इंजन में निर्धारित मात्रा में वायु दबाव/वैक्यूम प्राप्त हो गया है और ब्रेक पूरी तरह से रिलीज स्थिति में हैं।

No comments:

Post a Comment

Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

.


Labels

TRAFFIC (41) Control Organisation (6) Duty of Operating Staff (6) INDEX (6) Specification (5) Abnormal Working (3) CAUTION ORDER / SPEED RESTRICTIONS (3) Question Bank (3) Railway (3) TNC (3) 01.035 Duty of Points Man/Shunt Man (2) 04.03. OPERATING STATISTICS (2) Accident (2) Automatic Signal (2) Break Binding (2) Crank Handle (2) FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS) (2) Operating (2) Question with Answer (2) Safety Device (2) tnc. (2) 001. प्रस्तावना (1) 0010. स्टेशन संचालन नियम की अभिस्वीकृति रजिस्टर (क्र. 1 ) (1) 0011. कर्मचारी वैयक्तिक विवरण रजिस्टर (क्र. 2 ) (1) 0012. कर्मचारी परामर्श रजिस्टर (क्र. 3 ) (1) 0013. निरिक्षण रजिस्टर (क्र. 5 ) (1) 0014. एस एंड टी खराबी रजिस्टर (क्र. 7 ) (1) 0015. सतर्कता आदेश रजिस्टर (क्र. 8) (1) 0016. एस एंड टी खराबी मेमो बुक (क्र. 9 ) (1) 0017. दुर्घटना रजिस्टर (क्र. 11 ) (1) 0018. सतर्कता आदेश मैसेज बुक (क्र. 13) (1) 0019. संरक्षा तथा रजिस्टर (क्र. 14) (1) 002. स्टेशन मास्टर / उप स्टेशन मास्टर की ड्यूटी लिस्ट (1) 0020. डिस्कनेक्शन तथा रिकनेक्शन रजिस्टर (क्र. 15) (1) 0021. आपातकालीन क्रास ऑवर टेस्टिंग रजिस्टर (क्र. 16 ) (1) 0022. रिले रूम चाबी रजिस्टर (क्र. 19 ) (1) 0023. संयुक्त पाइंट एंड क्रासिंग रजिस्टर (क्र. 20) (1) 0024. संयुक्त ट्रैक सर्किट रजिस्टर (क्र. 20 A) (1) 0025. असामान्य संचालन रजिस्टर (क्र. 21 ) (1) 0026. स्टेबल लोड रजिस्टर (क्र. 22 ) (1) 0027. सिक बैगन रजिस्टर (क्र. 26) (1) 0028. क्रेक हैंडल टेस्टिंग रजिस्टर (1) 0029. इंजीनियरिंग एवं पॉवर ब्लाक रजिस्टर (1) 003. व्यक्तिगत परिचय (1) 0030. विभिन्न प्रकार के काउंटर नम्बर रजिस्टर (1) 0031. पैनल ब्लाक होने पर - स्टेशन मास्टर के कर्तव्य (1) 0033. गाड़ी संचालन से संबंधित महत्वपूर्ण अधिकार पत्र (1) 0034. स्टेशन परिचालन रजिस्टर के संरक्षण की सामान्य अवधि (1) 0035. घंटी कोड (1) 0037. दोहरी लाइन पर इकहरी लाइन का संचालन (1) 0038. कार्यभार सौपते समय तथा कार्यभार लेते समय ली जाने वाली सावधानियां (1) 0039. संरक्षा उपस्कर (1) 004. पूनश्र्चर्या पाठ्यक्रम (1) 0041. शंटिंग के दौरान ली जाने वाली सावधानियां (1) 0042. विभिन्न प्रकार के ब्लाक में लि जाने वाली सावधानियां (1) 0045. अग्रदाय राशि (1) 0046. सिग्नल पार करने (SPAD) पर स्टेशन मास्टर के कर्तव्य (1) 005. आवधिक चिकित्सा परीक्षा (PME) (1) 0051. बोगी कबर्ड बैगनो की जानकारी (1) 0052. कोचिंग स्टॉक का तकनीकी डाटा (1) 0054. LHB कोच की महत्वपूर्ण जानकारियाँ (1) 0056. स्टेशन पर अनिरक्षित किये जाने वाले अन्य रजिस्टर (लेखा विभाग से संबंधित ) (1) 0058. भरे हुए अधिकार पत्र (1) 006. संरक्षा परामर्श फार्म (1) 008. प्रायवेट नंबर शीट (1) 009. स्टेशन संचालन नियम (1) 01.01 History of Rail Transport in India (1) 01.02.Functions of the Traffic Department (1) 01.03. Hierarchical set up and line of control of Operating Department (1) 01.031 Responsibility of Station Master (supervisory) / Station Manager (1) 01.032 Duty of Deputy Station Manager (Outdoor)(Outdoor) (1) 01.033 Duty of Station Master / Manager - Block Station Master / Manager (1) 01.034 Duty of Panel SM (1) 01.036 Duty of Gate Man (1) 01.037 Normal Period Of Preserved - Station Operating Registers and Records (1) 01.04. CONTROL ORGANISATION (1) 01.05. Basic Function of control (1) 01.06. Duties of Control Staff (1) 01.07. Books / documents and basic records to be kept in control office (1) 01.09. Co- ordination between Control and stations (1) 01.10. Registers generally maintained in control (1) 01.11. Items checked by Sr. DOM daily/ regular intervals periodically & monthly (1) 02.01 ट्रेन कंट्रोल एव गाड़िया संचालन में कंट्रोल के जिम्मदारी (1) 02.02 ट्रैफिक कंट्रोल (1) 02.02. Emergency Rescue Operation / Disaster Management (1) 02.03. PREFERENTIAL TRAFFIC ORDER (1) 02.03.पॉवर कंट्रोल (1) 02.04 वैगनो & इंजन की उपयोगिता (ENGINE UTILIZATION) (1) 02.04. Importance of Freight Operation: (1) 02.05. TRANSPORT PRODUCTS (1) 02.06. FREIGHT INCENTIVE SCHEMES (1) 02.07. Rationalization Order (1) 02.08. Development of rail-side warehouses (1) 02.09.. Wagon Pool (1) 02.10. WAGON CENSUS ON BROAD GAUGE (1) 03 - मास्टर चार्ट (MASTER CHART) (1) 03.01. LOCO LINKS AND POWER PLAN CREW LINKS (1) 03.02. 10-Hour Rule for Train Crew (1) 03.03. LOCO MAINTENANCE SCHEDULE (1) 03.05. G D R ( GUARD DRIVER REPORT ) (1) 03.06. NOMINATED INTENSIVE EXAMINATION POINTS ON CENTRAL RAILWAY (1) 03.07. WORKING OF CLAMPED WAGON (1) 03.08. ODC (1) 03.10.1 DETAILS OF BRAKE POWER CERTIFICATE (1) 04 - सुबह की पोजीशन (MORNING POSITION) (1) 04.01. Section Capacity and Throughput (1) 04.08. ROLL ON - ROLL OFF (1) 05 - बगाडी संचालन पर प्रभाव डालने वाले कारक (FATO) (1) 05.01. Systems of Working (1) 05.03. All Communication Failure on Double line (1) 05.04. All Communication Failure on Single line (1) 05.05. TSL working on Double line (1) 05.06. Abnormal Working in Automatic Section (1) 06 - 01.उपनगरीय नियंत्रण (SUBURBAN CONTROL) (1) 06 - 02.एरिया कंट्रोल (1) 06 - 04.सेंट्रल कंट्रोल (1) 06 - 05.Emergency control (1) 06- 03.ट्रेन मैनेजमेंट सिस्टम (TRAIN MANAGEMENT SYSTEM) (1) 06.01. LOCO LINK (1) 06.02. RAKE LINK (1) 06.04. MARSHALLING OF TRAIN (1) 07 - नियंत्रण कार्यालय में विभाग नियंत्रकों के कर्त्तव्य (DUTIES) (1) 07.01. TIME TABLES – INTRODUCTION (1) 07.02. Punctuality (1) 07.03. COACHING VEHICLE CENSUS (1) 07.04. Rules for booking Special Coaches & Special Trains on FTR (1) 07.05. Coaching codes (1) 07.06. ACCIDENT AND SAFETY ORGANISATION (1) 08 - विभिन्न परिस्थियों में खण्ड नियंत्रक (SCOR) द्वारा किये जाने वाले कार्य (1) 09 - सवारी गाडी के कोड (IRCA Rule Book - IV) (1) 10 - संखियकी (STATISTICS) (1) 12 - 01.विशेष प्रकार के माल स्टॉक की मार्शलिंग (1) 12 - 02.माल गाडी का ब्लाक रेक / Standard rake size for Train load (1) 12 - 03.ओ डि सि (ODC) संचालन (1) 12 - यात्री और माल गाडी का ब्लाक रेक (1) 13 - 01.डीविज़न वैगन बैलेंस / (DIVISONAL WAGON BALANCE) (1) 14 - 01.थ्रू -पुट / THROUGH PUT (1) 14 - SECTION CAPACITY) (1) 15 - 01.मालगाड़ी को आदेशित करना (ट्रेन ओर्ड़ेरिंग / TRAIN ORDERING ) (1) 15 - 02.माल गाडी की औसात गति (1) 15 - 03.वैगनो का यानात्रण (Transhipment of Goods) (1) 15 - 07.गाड़ीयो का प्रस्थान पूर्व विलंब (PDD) (1) 15 - मालगाड़ी संचालन (Goods Train Operation) एवं लोड टेबल (1) 15 -06.कन्टेनराईजेशन Container (CONCOR) (1) 16 - 02.समय सारणी (TIME TABLE) (1) 16 - 03.रेक लिंक / (RAKE LINK) (1) 16 - 04.प्लेटफार्म ऑक्यूपेशन चार्ट / (Platform Occupation Chart) (1) 16 - 05.पिट लाइन ऑक्यूपेशन चार्ट (Pit Line Occupation Chart) (1) 16 - 06.विषेश/वी आई पी गाड़ीयो का संचालन (Movement of Special/VIP Trains) (1) 16 - 07.मेला एवं मिलिटरी स्पेशल गाड़ियों का संचालन एवं सावधानियाँ (1) 16 - यात्री गाडी संचालन / Passenger Train Operation (1) 17 - स्टॉक रिपोर्ट / Stock Report (1) 18 - 01.क्रू लिंक (CREW LINK) / लोको लिंक (LOCO LINK) (1) 18 - 02.दस घंटे नियम (10 HOURS RULE) (1) 18 - लॉबी कार्य पध्दति / LOBBY WORKING (1) 19 - 01.इंजन योजना (POWER PLAN) (1) 19 - 02.इंजन की उपयोगीता (ENGINE UTILISATION) (1) 19 - 03.विशिष्ठ उर्जा खपत / SPECIFIC FUEL CONSUMPTION (SPC) (1) 19 - विभिन प्रकार के इंजन और उनक हार्स पॉवर तथा गती (1) 2.1 Various Machines for Track Maintenance (1) 20 - 01. रेशनलाइजेशन स्कीम : / Rationalization Scheme (1) 20 - 02.रोक (BAN) & प्रतिबंध (RESTRICTION) (1) 20 - 03.वैगन पंजीकरण (1) 20 - 04.वैगन उपयोगीता चक्र (WTR) (1) 20 - 05.वेगन सेन्सस / WAGON CENSUS (1) 20 - वैगन उपयोगीता / अधिमान्य यातायात आदेश :(PTO/PTS) (1) 20.06.माल परिचालन सूचना प्रणाली (FOIS) एवं अन्य परिचालन सूचना प्रणाली (ICMS CMS COA ETC NTES) (1) 21 - 01.विधुतिकृत सेक्शन में गाड़िया का संचालन (1) 21 - 02.ट्रैफिक वोर्किंग रूल्स (TWR) (1) 21 - 03.टावर वैगन का संचालन (1) 21 - 04.रेल मंत्रालय के अंतर्गत सार्वजानिक क्षेत्र के उपक्रम और अन्य संगठन (PSUs) (1) 21 - समपार (लेवल क्रासिंग ) (1) 22 - 01.सिगनल को खतरे की स्तिथि में पर करना (SPAD) (1) 22 - 02.गंभीर दुर्घटना SERIOUS ACCIDENT (ऍम 105) (1) 22 - 03.दुर्घटना होने पर खंण्ड नियंत्रक के कर्त्तव्य (AM - ३१९) (1) 22 - 04.दुर्घटना स्थल के प्रभारी अधिकारी के कर्तव्य (AM - 324) (1) 22 - 05.मंडल नियंत्रण कार्यालय के प्रभारी अधिकारी के कर्तव्य - (AM - 323) (1) 22 - 06.दुर्घटना होने पर स्टेशन मास्टर की ड्यूटी (ऍम 311) (1) 22 - 07.रहत व्यवस्थाओ की ओर्ड़ेरिंग देना (AM - 405) (1) 22 - 08.अपघात प्रबंध (DISASTER MANAGEMENT) (1) 22 - 09.गोल्डन ऑवर(GOLDEN HOUR) (1) 22 - 11.नॉन - इंटरलॉकिंग संचालन (Non - Interlocked Working) (1) 22 - दुर्घटना (Accident) (ऍम 104) (1) 22.10 सुरक्षा डेविसस (Safety Devices) - ACD EOIT GSMR TAWD VCD WILD (1) 23 - कंट्रोल ओफ्फिक निर्देश (1) 24 - COA Main Menu (1) 25 - अग्रीम प्लाटिंग (चार्टिंग) / Advance Plotting (1) 26 - 01.नियंत्रण कार्यालय अनुप्रयोग हेतु त्वरित दिशा निर्दश (1) 26 - COA एवं FOIS के एकीकरण (Integration) हेतु अवय्शक निर्दाश (1) 27 - पश्चिम मध्य रेल तथा मध्य रेल के सहायक नियमो में विभिन्नता की सूची (1) 28 - निरीक्षण उसके उदेश्य और प्रकार (Inspection Its Objects & Type) (1) 28.01 Schedule Of Inspection By Operating / Safety Officers And Transportation Inspectors (1) 29 - दुर्घटना जाँच (Accident Inquiry) (1) 3.031 DIESEL LOCO SCHEDULE & DURATION (1) 3.09 ELECTRIC LOCOMOTIVE FEATURES (1) A.01 भारतीय रेल का इतिहास एवं प्रगति (1) A.02. भारतीय रेल का संगठनात्मक ढांचा (1) A.03.परिचालन विभाग का सेटअप (1) A.04. महत्वपूर्ण विभागों के सामान्य कार्य (1) A.05 सामान्य एवं सहायक नियम ब्लाक संचालन नियमावली दुर्घटना नियमावली (1) A.06.परिचालन नियमावली/ संचालन समय सारिणी (1) A.07.स्टेशन संचालन नियम (1) A.08.रेल सेवको पर साधारण लागू होने वाले नियम (1) A.09.महत्वपूर्ण परिभाषाए (1) A.10.सिगनलों का सामान्य परिचय (1) A.11.पटाखा सिगनल (1) A.12.हाथ सिगनल (1) A.13.गाड़ी संचालन पध्दतियाँ (1) A.15.वाहनों को सुरक्षित करना (1) A.17.हॉट एक्सल/फ़्लैट टायर/ओपेन डोर एवं हैंकिंग पार्ट (1) A.18.ट्रेन्स क्लर्क के कर्तव्य (1) A.19.स्टेशनों/यार्ड में रखे जाने वाले रजिस्टर (1) A.20.गाड़ी परिचालन में ट्रेन्स क्लर्क की भूमिका (1) A.21.गाड़ी संचालन से समबंधित महत्वपूर्ण नियम (1) A.22.कंट्रोल संगठन के कार्य (1) A.23.स्टेशन/यार्ड/कंट्रोल आफिस के क्रिया कलाप (1) A.24.विभिन्न प्रकार के कोचिंग एवं गुड्स स्टॉक (1) A.25.ब्रेक पावर प्रमाण पत्र (1) A.26.इंजन एवं ब्रेकयान में एयर प्रेशर की मात्रा (1) A.27.कंटीन्युटी टेस्ट (1) A.28.बड़े आयाम के प्रेषण (1) A.29.सेंसस एवं स्टॉक रिपोर्ट (1) A.30.मालगाड़ी संचालन/ गाडियों को आर्डर करना (1) A.31.डिविजन वैगन संतुलन (1) A.32.इन्टरचेंज (1) A.33.शंटिंग प्रतिबन्ध (1) A.35.वैगन पूल (1) A.36.वैगन उपयोगिता चक्र (1) A.37.परिचालन सांख्यिकी / परिचालन अनुपात (1) A.38.मोर्निंग पोजीशन फैटो (1) A.39.कोचिंग एवं गुड्स गाडियों की मार्शलिंग/घाट मार्शलिंग/रेक मार्शलिंग (1) A.41.जीडीआर चेक/ सेफ टू रन सर्टिफिकेट/ ओवर लोडिंग /अनइव्ह्न लोडिंग (1) A.42.लोड टेबल /एक्सल लोड / बैकिंग इंजन की आवश्यकता (1) A.43.माल गाडियों के विभिन्न प्रकार के ब्रेक पावर प्रमाणपत्र उनकी वैधता (1) A.44.स्थान शुल्क एवं विलंब शुल्क स्केटिंग (1) A.46.लोको आउटेज एवं इंजन उपयोगिता (1) ACF (1) AUTHORITIES USING IN TRAIN WORKING (1) AWS (1) Accident Drill (1) B.02.एफओआईएस/आर एस एम /टीएमएस /सीओआईएस/आईसीएमएस/पीएएम (1) B.05.यूटीएस/ पीआरएस UTS/PRS (1) B.06.ट्रेन मेनेजमेंट सिस्टम (1) B.07.एसीडी / टीसीएएस (1) BOOKED SPEED (1) Block working (1) COA (1) Correction Slip (1) DUTIES OF STATION MASTER IN THE CASE OF ACCIDENTS (1) Department (1) Duty (1) Duty List (1) Flat Tyre (1) Freight Train Operation (1) G.01 Code for LHB Coaching Stock (1) G.01 रेल सेवकों पर साधारणतया लागू होने वाले नियम (1) G.02 G & SR - परिभाषाएं (1) G.02 स्टेशन पर अग्निसमन उपकरण (1) G.03 इन्टरलाॅकिंग एवं नाॅन-इन्टरलाॅकिंग. (1) G.04 पाॅइन्ट एवं सिगनल (1) G.05 विभिन्न प्रकार की लाइटें एवं रिपीटर (1) G.06 संचालन मे आनेवाले विभिन्न प्रकार के बोर्डं (1) G.07 इंजीनियरिंग सिगनल एवं कार्यस्थल का बचाव (1) G.08 सिगनल तथा पाॅइन्ट की खराबी (1) G.09 सिगनल खराब होने पर गाड़ियों का संचालन (1) G.10 कार्य संचालन पद्धति (1) G.11केवल एक गाड़ी पद्धति (1) G.12 सम्पूर्ण ब्लाॅक पद्धति (1) G.13 गाड़ियों का संचालन (1) G.14 स्टेशनों पर बजाई जाने वाली घंटीया (1) G.15 आटोमेटिक ब्लाॅक पद्धति (1) G.16 अनुगामी गाड़ी पद्धति (1) G.17 सतर्कता आदेश (1) G.18 अवरुद्ध लाइन/ बिना सिगनल वाली लाइन व काॅमन स्टार्टर पर गाड़ी का संचालन (1) G.19 शन्टिंग (1) G.21 मार्शलिंग एवं डेड इंजन का संचालन (1) G.21 गाड़ी को स्टेशन से रवाना करना (1) G.23 समयपालन (1) G.24 लोको पायलट व गार्ड के निजी उपकरण (1) G.25 गार्ड व लोको पायलट से संबंधित रजिस्टर व प्रपत्र (1) G.26 रनिंग लाइन पर लोड को स्टेबल व क्लीयर करना (1) G.28 लोको पायलट व गार्ड की ड्यूटी (1) G.29 विभिन परिस्थितियों में लोको पायलट की ड्यूटी (1) G.30 मेटेरियल ट्रेन का संचालन (1) G.31 विभिन्न परिस्थितियों मे स्टेशन मास्टर की ड्यूटी (1) G.32 गाड़ियों की गति (1) G.33 कैच एवं स्लिप साइडिंग (1) G.33 स्टेशनों पर विभिन्न उपकरण (1) G.34 लाॅक एवं ब्लाॅक उपकरण (1) G.35 असामान्य परिस्थितियों में गाड़ियों का संचालन (1) G.36 इंजन सीटी कोड (1) G.37 ई एम यू / एम ई एम यू / डी एम यू में संके तहेतु बेल कोड (1) G.37 नए परिचालन फाॅर्म (1) G.38 इंजीनियरिंग कार्य प्रणाली व इंजीनियरिंग वाहनों का संचाल (1) G.38 पावर ब्लाॅक (1) G.39 पाइथाॅन रैक का संचालन (1) G.40 गाड़ी लिपिक के रजिस्टर व कार्यप्रणाली (1) Group "B" (1) HKT (1) KNOW ABOUT - जन शिकायत पुस्तिका (1) LED Torch (1) Lobby system (1) Loco Pilot Duty (1) MPS (1) Medical Care (1) Pad Lock (1) Private Number (1) Question Bank & Papers With Answer For Group "B" / Guard / Station Master etc Exam (1) Rule. Manual (1) S 01.0 Significance Of Rule Books (1) S 01.01 Differences Between General And Subsidiary Rules (1) S 02.00 Rules And Instructions (1) S 03.00 Rules Applying To The Railway Servant Generally (1) S 04.00 Definition Of Operating Terms (1) S 05.00 Classification Of Station (1) S 06.00 Signals (1) S 07.00 DETONATING SIGNAL (1) S 08.00 Hand Signal (1) S 09.00 Traffic Board And Engineering Indicators (1) S 11.00 CONDITIONS FOR TAKING OFF SIGNALS (1) S 12.00 CONDITIONS FOR CLEARING THE SECTION AND PRECAUTIONS (1) S 13.00 AUTHORITIES USING IN TRAIN WORKING (1) S 14.00 INTERLOCKING AND ISOLATION (1) S 15.00 POINTS (1) S 16.00 WORKING OF TRAINS DURING OVERHAULING (1) S 17.00 DEFECTIVE POINTS (1) S 19 DEFECTIVE SIGNALS (1) S 20.00 Reception Dispatch And Crossing Of Train At Station (1) S 21.00 SHUNTING (1) S 22.00 PUSHING BACK OF TRAIN (1) S 23.00 SECURING VEHICLES AT STATION (1) S 24.00 VEHICLES ESCAPING FROM STATION (1) S 25.00 WORKING OF MATERIAL TRAIN (1) S 25.01 Procedure of sending material train into the Block Section (1) S 25.02 STABLING OF MATERIAL TRAIN (1) S 26.00 HOT AXLE AND FLAT TYRE (1) S 27.00 WORKING OF TRAIN WITHOUT BRAKE VAN (1) S 28.00 STANDARD TIME (1) S 29.00 SPEED CHART (1) S 30.00 ELECTRIC BLOCK INSTRUMENT (1) S 31.00 TAIL LAMP AND TAIL BOARD (1) S 36.00 TRAIN PARTING (1) S 37.00 TRAIN DIVIDING (1) S 38.00 SEND ASSISTING ENGINE INTO OBSTRUCTED BLOCK SECTION (1) S 39.00 TRAIN DELAYED IN BLOCK SECTION (1) S 40.00 ACCIDENT (1) S 41.00 DISASTER MANAGEMENT (1) S 42.00 YARD (1) S 43.00 DUTIES OF STATION STAFF TOWARDS CONTROL (1) S 44.00 WAGON EXCHANGE REGISTER (1) S 45.00 STOCK REPORT (1) S 46.00 WORKING OF TRAIN IN GHAT SECTION / CATCH AND SLIP SIDING (1) S 47.00 MEANS OF COMMUNICATION AND WHISTLE CODE (1) S 48.00 ACTION TAKEN DURING THE ACP (1) S 49.00 WORKING OF TRAIN DURING STORM / ANEMOMETER CYCLONE (1) S 50.00 FIRE IN TRAIN (1) S 51.00 INFORMATION SYSTEM / COA/ FOIS/ ICMS/ PRS etc (1) S 52.00 ACD (1) S 53.00 LOCOMOTIVE LIGHT (1) S 54.00 WORKING OF TRAIN IN ELECTRIFIED SECTION AND TOWER WAGON (1) S 55.00 LEVEL CROSSING GATE (1) S 56.00 OVER DIMENSIONAL CONSIGNMENT (O.D.C. ) (1) S 57.00 MARSHALLING (1) S 58.00 WORKING OF TROLLY/LORRY (1) S 59.00 TYPES OF TRACK MACHINE (1) S 60.00 MANSOON PATROLLING (1) S 61.00 DEFECTIVE PARMANENT WAY (1) S 62.00 WORKING OF LONG HAUL TRAINS (PYTHON) ON CENTRAL RAILWAY (1) S 63.00 HEAVY HAUL TRAINS (1) S 64.00 ABBREVIATION (1) S 65.00 DIFFERENCE BETWEEN SUBSIDIARY RULES OF CR AND WCR (1) SH (1) SPEED ON TURNOUTS (1) Safety Chain (1) Scotch Block (1) Skid (1) Station Earning (1) Station Inspection (1) Train Manager (Guard) (1) VTO (1) Video (1) WORKING OF TRACK MACHINE (TTM etc.) (1) Yard Congestion (1) fois (1) k (1) long Haul (1) योजना बनाने में स्टेशन मास्टर की भूमिका (1) सिगनलों का आदान प्रदान (1) स्टेशन मास्टर अवश्य ध्यान दे (1)