Procedure of sending material train into the Block Section
1) On Double Line -
a) Work and proceed via Right direction
i) Material train will enter into the Block Section on proper line clear.
ii) The train shall be received by taking OFF the reception signals at next station.
b) Work and return via right direction
i) The train shall enter into the block section on block forward.
ii) T/369 (3b) shall be issued to pass the Last Stop Signal at ON.
iii) Pushing back memo shall be issued.
iv) On return, the train shall be received as per the rules applicable to pushing back.
c) Work and Return via wrong line
i) The section will be blocked back.
ii) T/806 shall be issued to enter into the block section.
iii) Pushing back memo shall be issued.
iv) On return of the train, it shall be received by taking OFF the reception signal.
2) On Single Line
a) Work and proceed
i) Train shall be entered into the Block section on proper line clear.
ii) It shall be received by taking OFF the reception signals.
b) Work and Return- (Tokenless Block Instrument)
i) The section shall be Blocked Back.
ii) T/369 (3b) shall be issued to pass last stop signal at ON.
iii) Pushing Back memo shall be issued to the LP.
iv) On return, the train shall be received by taking OFF the reception signals as per the rules applicable to pushing back.
c) Work and return ( with token block instrument)
i) Line clear shall be obtained.
ii) Token tablet shall be given to the LP.
iii) Pushing Back memo shall be issued to the LP.
iv) On return, the train shall be received by taking OFF the reception signals as per the rules applicable to pushing back.