All Communication Failure on Single line

All Communication Failure on Single line (SR 6.02 – 4)

1. In the event of total interruption of communication (TIC) occurring between two stations on a single line section, i.e. when Line Clear cannot be obtained by any one of the following means stated in order of preference viz:
a. Block instruments; Track circuits or Axle counters;
b. Telephones attached to the Block Instruments;
c. Station to station fixed telephones wherever available;
d. Fixed telephone such as Railway auto phones & BSNL / MTNL phones;
e. Control Telephone;
f. VHF sets under special instructions, but not as the sole means of communication on sections where passenger trains run.

All Communication Failure on Double line

All Communication Failure on Double line (SR 6.02 –3)

1. In the event of total interruption of communication (TIC) occurring between two stations on a double line section, i.e. when Line Clear cannot be obtained by any one of the following means stated in order of preference viz :

  a. Block instruments; Track circuits or Axle counters;
  b. Telephones attached to the Block Instruments;
  c. Station to station fixed telephones wherever available;
  d. Fixed telephone such as Railway auto phones & BSNL / MTNL phones;
  e. Control Telephone;
 f. VHF sets under special instructions, but not as the sole means of communication on sections where               passenger trains run.

The following procedure shall be adopted for train passing.

LOCO LINK

LOCO LINK

Loco link is an arrangement of locomotive for working a set of trains from one station to other station for Mail/Express/Passenger trains. Loco link gives the requirement of locomotive required to run the given number of trains. Loco link is prepared by HQ office in consultation with COM.

Factors to be considered while preparing a loco link:

1) Availability of the Loco.
2) Trip Inspection:

Mail/Express or Passenger locomotives are required to be given trip inspection as under as per AC traction manual:-
After running of 3000 kms or at completion of a trip whichever is later.

ROLL ON - ROLL OFF

ROLL ON - ROLL OFF:


The Ro - Ro scheme was first introduced in Konkan Railway in 1999. This enables carrying the loaded trucks directly on the railway wagons, thus reducing the expenditure on diesel, wear and tear of tyres and maintenance of trucks for truck operators.
This is providing faster turn round and higher profits to the transporters. This service ensures timely and safe delivery free of any risk factor and without multiple handling of consignments.
This is a regular service between Mangalore to Bombay on Western Ghats cutting down nearly 10 hours transit time. On finding the success, arrangements are made to run such trains between Bombay and Howrah on nominated days.

OPERATING STATISTICS

 OPERATING STATISTICS

Railway Statistics: Essential for planning prioritizing and exceeding activities connected with operation.

The railway statistics are based on four factors -

Quantity
Distance
Duration and
Service

In Railway environment these relate to –

DETAILS OF BRAKE POWER CERTIFICATE

Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

.